Pasar al contenido principal

CONTROL PREDICTIVO DE SISTEMAS ENERGETICOS DISTRIBUIDOS CON FUENTES RENOVABLES Y ALMACENAMIENTO ESTACIONARIO Y MOVIL

DPI2013-46912-C2-1-R

•
Nombre agencia financiadora Ministerio de Economía y Competitividad
Acrónimo agencia financiadora MINECO
Programa Programa Estatal de I+D+i Orientado a los Retos de la Sociedad
Convocatoria Proyectos I+D+i Retos de Investigación
Año convocatoria 2013
Plan Estatal 2013-2016 Plan Estatal de Investigación Científica y Técnica y de Innovación
Unidad de gestión Secretaría de Estado de Educación, Formación Profesional y Universidades
Centro beneficiario UNIVERSIDAD DE SEVILLA
Identificador persistente http://dx.doi.org/10.13039/501100003329

Resultados relacionados

Resultados totales (Incluyendo duplicados): 1
Encontrada(s) 1 página(s)

DIGITAL.CSIC. Repositorio Institucional del CSIC
Publicación Artículo científico (JournalArticle)

On the comparison of stochastic model predictive control strategies applied to a hydrogen-based microgrid

  • Velarde, P.
  • Valverde, L.
  • Maestre, Jose Maria
  • Ocampo-Martínez, Carlos
  • Bordons, C.
In this paper, a performance comparison among three well-known stochastic model predictive control approaches, namely, multi-scenario, tree-based, and chance-constrained model predictive control is presented. To this end, three predictive controllers have been designed and implemented in a real renewable-hydrogen-based microgrid. The experimental set-up includes a PEM electrolyzer, lead-acid batteries, and a PEM fuel cell as main equipment. The real experimental results show significant differences from the plant components, mainly in terms of use of energy, for each implemented technique. Effectiveness, performance, advantages, and disadvantages of these techniques are extensively discussed and analyzed to give some valid criteria when selecting an appropriate stochastic predictive controller., Financial support from the Spanish Ministry of Economy and Competitiveness (COOPERA project, under grant DPI2013-46912-C2-1-R) and the project ECOCIS (Ref. DPI2013-48243-C2-1-R) is acknowledged., Peer Reviewed