Pasar al contenido principal

SUPERFICIES URBANAS PERMEABLES E INTELIGENTES

BIA2015-65240-C2-2-R

•
Nombre agencia financiadora Ministerio de Economía y Competitividad
Acrónimo agencia financiadora MINECO
Programa Programa Estatal de I+D+i Orientado a los Retos de la Sociedad
Convocatoria Proyectos I+D+i Retos de Investigación
Año convocatoria 2015
Plan Estatal 2013-2016 Plan Estatal de Investigación Científica y Técnica y de Innovación
Unidad de gestión Dirección General de Investigación Científica y Técnica
Centro beneficiario UNIVERSITAT POLITÈCNICA DE VALÈNCIA
Identificador persistente http://dx.doi.org/10.13039/501100003329

Resultados relacionados

Resultados totales (Incluyendo duplicados): 1
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Contribución de congreso (ConferenceOutput)

Influence of pollution build-up and pavement cross section on permeable pavements under extreme rainfall events

  • Fernández-Gonzalvo, Miriam Inmaculada
  • Hernández Crespo, Carmen|||0000-0002-6727-0481
  • Martín Monerris, Miguel|||0000-0001-7464-9505
  • Andrés-Doménech, Ignacio|||0000-0003-4237-4863
[EN] Permeable pavement systems (PPS) are part of the stormwater management technologies known as Sustainable Urban Drainage Systems (SUDS). The main objective of this is to analyse its buffering capacity (quantity and quality of filtered water) under extreme rainfall events. To this end, two different pavement cross-sections, complete configuration (C1) and simple configuration (C2), have been tested at laboratory scale for the 25-year return period 10-min intensity rainfall in Valencia (Spain). Four different pollutant build-up levels have been studied (at one, three, six and 12 months). For all the simulated rainfall events, the quantity (hydrographs and drained volume) and quality (DQO, TSS, TN and TP concentrations) of filtered water were characterized. On the one hand, configuration C1 reduced more than C2 the peak flow of filtered water for the same dirt and dust build-up. Moreover, peaks are wider in time, so the filtered water is better distributed. Regarding the influence of pollution build-up level, it can be observed that higher dust and dirt build-up gave rise to lower flow rates. In general, the larger the quantity of pollutant build-up accumulated on the pavement surface, the larger the volume of water was retained because it absorbed part of the rain, thus smoothing the peak flow of filtered water. On the other hand, the pollutant mass leached from the pavement C1 is lower than C2. When the amount of dust and dirt deposited was lower, the rainfall was able to leach more pollutant with respect to the total mass deposited. The results show the importance of an adequate cleaning program with a frequency no lower than once a month and a better response, in terms of water pollution retention, of the complete configuration (C1) during times of heavy rainfall., This research has been developed within the SUPRIS-SUPel project framework (Ref. BIA2015-6540-C2-2-R MINECO/FEDER, EU). This project had been financed by the Ministry of Economy and Competitiveness of Spain through the General State Budget and the European Regional Development Fund (ERDF). Currently, the second phase of the project, ENGODRAIN ¿ RTI2018-094217-B-C31, financed by the State Agency for Research from Spain through the General State Budget and the European Regional Development Fund (ERDF), is continuing. The authors would also like to thank the companies Quadro Concrete Prefabs S.L., TenCate Geosynthetics Iberia S.L., Atlantis SUDS S.L. and SECOPSA for supplying materials for the tests. Finally, the hiring of Miriam Inmaculada Fernández Gonzalvo has been possible to the program of subsides for hiring of pre-doctoral research personnel (ACIF/2018/111) of the Generalitat Valenciana.