RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication
Contribución de congreso (ConferenceOutput)
A Decentralized Multi-Agent Coordination Method for Dynamic and Constrained Production Planning
[EN] In the capacitated production planning problem, quantities of products need to be determined at consecutive periods within a given
time horizon when product demands, costs, and production capacities vary through time. We focus on a general formulation of this
problem where each product is produced in one step and setup cost
is paid at each period of production. Additionally, products can be
anticipated or backordered in respect to the demand period. We
propose a computationally efficient decentralized approach based
on the spillover effect relating to the accumulation of production
costs of each product demand through time. The performance of
the spillover algorithm is compared against the state-of-the-art
mixed integer programming branch-and-bound solver CPLEX 12.8
considering optimality gap and computational time., This work is supported by: the Spanish MINECO
projects RTI2018-095390-B-C33 (MCIU/AEI/FEDER, UE) and TIN2017-
88476-C2-1-R, the French ADEME project E-Logistics, and an STSM
Grant funded by the European ICT COST Action IC1406, cHiPSet.
Project:
Agencia Estatal de Investigación / Plan Estatal de Investigación Científica y Técnica y de Innovación 2013-2016 TIN2017-88476-C2-1-R
,
European Cooperation in Science and Technology / COST Action IC1406
,
Agencia Estatal de Investigación / Plan Estatal de Investigación Científica y Técnica y de Innovación 2017-2020 RTI2018-095390-B-C33