Skip to main content

METODOS ESTADISTICOS PARA ENSAYOS CLINICOS, PATRONES DE CENSURA COMPLEJOS Y ANALISIS INTEGRADO DE DATOS OMICOS

MTM2015-64465-C2-1-R

•
Funding agency name Ministerio de Economía y Competitividad
Funding agency acronym MINECO
Program Programa Estatal de I+D+i Orientado a los Retos de la Sociedad
Call Proyectos I+D+i Retos de Investigación
Call year 2015
State Plan 2013-2016 Plan Estatal de Investigación Científica y Técnica y de Innovación
Management unit Dirección General de Investigación Científica y Técnica
Beneficiary centre UNIVERSITAT POLITECNICA DE CATALUNYA

Resultados relacionados

Resultados totales (Incluyendo duplicados): 4
Encontrada(s) 1 página(s)

UPCommons. Portal del coneixement obert de la UPC
Publication Contribución de congreso (ConferenceOutput)

Using simulation and reliability concepts to set starting times in multitask projects with a common deadline

  • Juan Pérez, Ángel Alejandro
  • Calvet Liñán, Laura
  • Serrat Piè, Carles|||0000-0002-1504-5354
  • Hatami, Sara|||0000-0002-8000-4989
In production and transportation logistics, it is frequent to have projects in which different tasks must be processed in parallel and completed before a common deadline. Usually, it is not desirable to assign scarce resources to a new project earlier than strictly necessary, since they might be currently occupied in other projects. When these tasks have random completion times, some natural questions arise: (i) how much can we delay the starting time of each task in the new project so that it can be completed by the deadline with a given probability? and (ii) how to compute these ‘optimal’ starting times when not all tasks need to be necessarily finished to consider the project as completed? This paper proposes a hybrid approach, combining reliability concepts with simulation and optimization techniques, to support decision makers in finding the optimal starting times for each task under the described uncertainty scenario., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publication Contribución de congreso (ConferenceOutput)

A vector scale of severity of damages in buildings

  • Ruiz Gorrindo, Félix
  • Aguado de Cea, Antonio|||0000-0001-5542-6365
  • Serrat Piè, Carles|||0000-0002-1504-5354
In the context of the existing buildings, along the recent years the concept of maintenance has changed from corrective maintenance to preventive maintenance, which is based in part on periodic inspections. There is ample evidence that preventive maintenance is more efficient than corrective maintenance, since severe deteriorations that may represent danger to people are avoided, and also money is saved. To make periodic inspections of the buildings is useful to quantify the extent to which deficiencies are severe or not, in order to facilitate decision making and prioritize therapeutic interventions. To this purpose many scales have been used and are used to assess the degree of gravity of the damages in constructive elements. But it is important to say that there is no common consensus and these scales are different between them according to the study to which they belong. Thus, the main goal of this article is to propose a methodology for calculating the degree of severity of damages in buildings, which is of widespread use. This calculation method, which is in distribution and in scalar, lets to calculate the severity index of systems and of the entire building, and it is easy to use and flexible., This research has been partially supported by grants MTM2015-64465-C2-1-R (MINECO / FEDER) from the Ministerio de Economía y Competitividad (Spain) and 2017 SGR 622 from the Departament d’Economia i Coneixement de la Generalitat de Catalunya. Authors are grateful to members of the IEMAE, LABEDI and GRASS-GRBIO groups their valuable comments and suggestions in the development of the work., Objectius de Desenvolupament Sostenible::11 - Ciutats i Comunitats Sostenibles
Recercat. Dipósit de la Recerca de Catalunya
Publication Contribución de congreso (ConferenceOutput)

Using simulation and reliability concepts to set starting times in multitask projects with a common deadline

  • Juan Pérez, Ángel Alejandro
  • Calvet Liñán, Laura
  • Serrat Piè, Carles
  • Hatami, Sara
In production and transportation logistics, it is frequent to have projects in which different tasks must be processed in parallel and completed before a common deadline. Usually, it is not desirable to assign scarce resources to a new project earlier than strictly necessary, since they might be currently occupied in other projects. When these tasks have random completion times, some natural questions arise: (i) how much can we delay the starting time of each task in the new project so that it can be completed by the deadline with a given probability? and (ii) how to compute these ‘optimal’ starting times when not all tasks need to be necessarily finished to consider the project as completed? This paper proposes a hybrid approach, combining reliability concepts with simulation and optimization techniques, to support decision makers in finding the optimal starting times for each task under the described uncertainty scenario., Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publication Contribución de congreso (ConferenceOutput)

A vector scale of severity of damages in buildings

  • Ruiz Gorrindo, Félix
  • Aguado de Cea, Antonio
  • Serrat Piè, Carles
In the context of the existing buildings, along the recent years the concept of maintenance has changed from corrective maintenance to preventive maintenance, which is based in part on periodic inspections. There is ample evidence that preventive maintenance is more efficient than corrective maintenance, since severe deteriorations that may represent danger to people are avoided, and also money is saved. To make periodic inspections of the buildings is useful to quantify the extent to which deficiencies are severe or not, in order to facilitate decision making and prioritize therapeutic interventions. To this purpose many scales have been used and are used to assess the degree of gravity of the damages in constructive elements. But it is important to say that there is no common consensus and these scales are different between them according to the study to which they belong. Thus, the main goal of this article is to propose a methodology for calculating the degree of severity of damages in buildings, which is of widespread use. This calculation method, which is in distribution and in scalar, lets to calculate the severity index of systems and of the entire building, and it is easy to use and flexible., This research has been partially supported by grants MTM2015-64465-C2-1-R (MINECO / FEDER) from the Ministerio de Economía y Competitividad (Spain) and 2017 SGR 622 from the Departament d’Economia i Coneixement de la Generalitat de Catalunya. Authors are grateful to members of the IEMAE, LABEDI and GRASS-GRBIO groups their valuable comments and suggestions in the development of the work., Objectius de Desenvolupament Sostenible::11 - Ciutats i Comunitats Sostenibles, Postprint (published version)