Skip to main content

EXPERIMENTAL AND NUMERICAL STUDY OF GEOLOGIC CARBON STORAGE ?

PCI2021-122077-2B

•
Funding agency name Agencia Estatal de Investigación
Funding agency acronym AEI
Program Programa Estatal para Afrontar las Prioridades de Nuestro Entorno
Subprogram Subprograma Estatal de Internacionalización
Call Proyectos Programación Conjunta Internacional
Call year 2021
State Plan 2021-2023 Plan Estatal de Investigación Científica y Técnica y de Innovación
Beneficiary centre AGENCIA ESTATAL CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS (CSIC)

Resultados relacionados

Resultados totales (Incluyendo duplicados): 1
Encontrada(s) 1 página(s)

DIGITAL.CSIC. Repositorio Institucional del CSIC
Research data Set de datos (Dataset)

Numerical models for the simulation of bleed-off control on post-injection seismicity in ‎enhanced geothermal systems

  • Kivi, Iman Rahimzadeh
  • Vilarrasa, Víctor
[Description of methods used for collection/generation of data] The models are 2D plane strain including a homogeneous and isotropic granitic reservoir rock ‎intersected by an interconnected fracture network and a distant fault to the wellbore. Generic hydromechanical properties are assumed for the reservoir rock and the intersecting fractures and fault. The fault ‎in the models is either hydraulically isolated from the fracture network, i.e., our "basecase" scenario, or intersected by them, a scenario referred to as "connected". Post-‎injection protocols to control seismicity include well shut-in or bleed-off. During bleed-off, the ‎wellhead is opened to impose hydrostatic pressure conditions along the well over a period of ‎either 24 h or 1 h. The ‎hydrostatic pressure profile is maintained afterwards. Different injection ‎periods are considered to inspect the effect of this parameter on the effectiveness of bleed-off ‎in controlling post-injection seismicity. ‎, [Methods for processing the data] The Code_Bright executables "Cb_v9_3.exe" or "Cb_v9_1_3par4", i.e., the parallel version of the code running on 4 CPU cores, can be used to run the numerical models. Upon running the executables, the code generates several outputs, including "root.post.msh" and "root.post.res". These two outputs include the mesh structure and the simulation results, respectively. Any postprocessing software supporting the output file formats can be used to visualize the data., The Global physics-based database of injection-induced seismicity is licensed under Creative Commons CC BY 4.0 International License. Users are free to copy and redistribute the database material in any medium or format, and remix, transform, and build upon the material for any purpose, even commercially., This dataset comprises the input files for numerical simulation of stimulating an enhanced geothermal system and the associated risk of induced seismicity. Numerical models explore the hydromechanical mechanisms of post-injection induced seismicity and the potential impact of bleed-off to control seismicity. The models are 2D plane strain including a homogeneous and isotropic granitic reservoir rock intersected by an interconnected fracture network and a distant fault to the wellbore. The fault in our numerical models is either hydraulically isolated from the fracture network, i.e., our “basecase” scenario, or intersected by them, a scenario referred to as “connected”. Post-injection protocols to control seismicity include well shut-in or bleed-off. During bleed-off, the wellhead is opened to impose hydrostatic pressure conditions along the well over a period of either 24 h or 1 h. The ‎hydrostatic pressure profile is maintained afterwards. Different injection periods are considered to inspect the effect of this parameter on the effectiveness of bleed-off in controlling post-injection seismicity. Following this brief explanation, the dataset includes seven models provided in seven distinct folders: “Basecase_Inj250h_shutin”, basecase scenario of 250 h injection followed by well shut-in, “Basecase_Inj250h_bleedoff_1h”, basecase scenario of 250 h injection followed by well bleed-off over 1 h, “Basecase_Inj250h_bleedoff_24h”, basecase scenario of 250 h injection followed by well bleed-off over 24 h, “Connected_Inj84h_shutin”, connected scenario of 84 h injection followed by well shut-in, “Connected_Inj84h_bleedoff_1h”, connected scenario of 84 h injection followed by well bleed-off over 1 h, “Connected_Inj200h_shutin”, connected scenario of 200 h injection followed by well shut-in, “Connected_Inj200h_bleedoff_1h”, connected scenario of 200 h injection followed by well bleed-off over 1 h. In each folder, there is a file with the name of the folder ending as “_gen.dat” which contains the input data of the model, including material properties, initial and boundary conditions and the time intervals. There is also a file ending as “_gri.dat” that includes the information on the mesh. The file “root.dat” includes the name of the model. To run the simulation, execute the Code_Bright executables “Cb_v9_3.exe” or “Cb_v9_1_3par4”, i.e., the parallel version of the code running on 4 CPU cores, in each folder., - Project EASY GEO-CARBON ‎‎(www.easygeocarbon.com)‎ funded by MCIN/AEI‎ through grant number PCI2021-122077-2B‎. - The UKRI Postdoc Guarantee ‎Award THMC4CCS funded by the Engineering and Physical Sciences Research Council through grant number EP/X026019/1. - The ‎Starting Grant ‎‎GEoREST (www.georest.eu) funded by the European Research Council (ERC) under ‎the ‎‎European Union’s Horizon 2020 Research and ‎Innovation Program through under Grant ‎agreement No. 801809. ‎‎, This dataset comprises the input files for numerical simulation of stimulating an enhanced ‎geothermal system and the associated risk of induced seismicity. Numerical models explore the ‎hydromechanical mechanisms of post-injection induced seismicity and the potential impact of ‎bleed-off to control seismicity.‎ The dataset includes seven models provided in seven distinct folders: ‎ ‎"Basecase_Inj250h_shutin", basecase scenario of 250 h injection followed by well shut-in,‎ ‎"Basecase_Inj250h_bleedoff_1h", basecase scenario of 250 h injection followed by well bleed-‎off over 1 h,‎ ‎"Basecase_Inj250h_bleedoff_24h", basecase scenario of 250 h injection followed by well ‎bleed-off over 24 h, ‎ ‎"Connected_Inj84h_shutin", connected scenario of 84 h injection followed by well shut-in,‎ ‎"Connected_Inj84h_bleedoff_1h", connected scenario of 84 h injection followed by well bleed-‎off over 1 h,‎ ‎"Connected_Inj200h_shutin", connected scenario of 200 h injection followed by well shut-in,‎ ‎"Connected_Inj200h_bleedoff_1h", connected scenario of 200 h injection followed by well ‎bleed-off over 1 h.‎, Peer reviewed