Skip to main content

Resultados relacionados

Resultados totales (Incluyendo duplicados): 1
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Contribución de congreso (ConferenceOutput)

Solving Ceramic Tile Factory Production Programming by MAS

  • Argente, Estefanía|||0000-0002-5431-3868
  • Giret Boggino, Adriana Susana|||0000-0002-2311-0785
  • Valero Cubas, Soledad|||0000-0003-4565-326X
  • Gómez-Gasquet, Pedro|||0000-0002-9184-6735
  • Julian, Vicente|||0000-0002-2743-6037
[EN] This paper presents a system architecture to manage the production programming in a Ceramic Tile factory. The proposed architecture is based on the multi-agent system paradigm since it provides a natural way to solve problems in manufacturing industry domains. The production programming problem is considered as one of the main critical issues in a Ceramic Tile Company because obtaining an agile and reactive production planning and scheduling system is essential in manufacturing. The paper describes the proposed agent organization and the different needed scenarios and interactions in detail., This work has been partially funded by Polytechnic University of Valencia under grant PII-UPV 5574. Financial support from Spanish government under grant FPU AP2001-1516 and TIC2003-07369-C02-01 is also gratefully acknowledge.