Pasar al contenido principal

DESARROLLO DE REQUISITOS DE VIGILANCIA AVANZADOS ENFOCADOS A LA SEGURIDAD Y COMPETITIVIDAD DE LA OPERACION A LARGO PLAZO DE CENTRALES NUCLEARES

ENE2013-45540-R

•
Nombre agencia financiadora Ministerio de Economía y Competitividad
Acrónimo agencia financiadora MINECO
Programa Programa Estatal de I+D+i Orientado a los Retos de la Sociedad
Convocatoria Proyectos I+D+i Retos de Investigación
Año convocatoria 2013
Plan Estatal 2013-2016 Plan Estatal de Investigación Científica y Técnica y de Innovación
Unidad de gestión Secretaría de Estado de Educación, Formación Profesional y Universidades
Centro beneficiario UNIVERSITAT POLITÈCNICA DE VALÈNCIA
Identificador persistente http://dx.doi.org/10.13039/501100003329

Resultados relacionados

Resultados totales (Incluyendo duplicados): 5
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Optimization of test and maintenance of ageing components consisting of multiple items and addressing effectiveness

  • Marton Lluch, Isabel|||0000-0001-6955-3912
  • Martorell-Aygues, Pablo
  • Sánchez Galdón, Ana Isabel|||0000-0002-3159-8020
  • Martorell Alsina, Sebastián Salvador|||0000-0003-1706-4740
  • Mullor, Rubén
[EN] There are many models in the literature that have been proposed in the last decades aimed at assessing the reliability, availability and maintainability (RAM) of safety equipment, many of them with a focus on their use to assess the risk level of a technological system or to search for appropriate design and/or surveillance and maintenance policies in order to assure that an optimum level of RAM of safety systems is kept during all the plant operational life. This paper proposes a new approach for RAM modelling that accounts for equipment ageing and maintenance and testing effectiveness of equipment consisting of multiple items in an integrated manner. This model is then used to perform the simultaneous optimization of testing and maintenance for ageing equipment consisting of multiple items. An example of application is provided, which considers a simplified High Pressure Injection System (HPIS) of a typical Power Water Reactor (PWR). Basically, this system consists of motor driven pumps (MDP) and motor operated valves (MOV), where both types of components consists of two items each. These components present different failure and cause modes and behaviours, and they also undertake complex test and maintenance activities depending on the item involved. The results of the example of application demonstrate that the optimization algorithm provide the best solutions when the optimization problem is formulated and solved considering full flexibility in the implementation of testing and maintenance activities taking part of such an integrated RAM model., Authors are grateful to the Spanish Ministry of Science and Innovation for the financial support of this work (research project ENE2013-45540-R) and the Doctoral fellow (BES-2011-043906 and BES-2014-067602).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Ageing PSA incorporating effectiveness of maintenance and testing

  • Marton Lluch, Isabel|||0000-0001-6955-3912
  • Sánchez Galdón, Ana Isabel|||0000-0002-3159-8020
  • Martorell Alsina, Sebastián Salvador|||0000-0003-1706-4740
This paper proposes a new approach to Ageing Probabilistic Safety Assessment (APSA) modelling, which is intended to be used to support risk-informed decisions on the effectiveness of maintenance management programs and technical specification requirements of critical equipment of Nuclear Power Plants (NPP) within the framework of the Risk Informed Decision Making according to R.G. 1.174 principles. This approach focuses on the incorporation of not only equipment ageing but also effectiveness of maintenance and efficiency of surveillance testing explicitly into APSA models and data. An example of application is presented, which centres on a critical safety-related equipment of a NPP in order to evaluate the risk impact of considering different approaches to APSA and the combined effect of equipment ageing and maintenance and testing alternatives along NPP design life. The risk impact of the several alternatives is quantified and the results shows that such risk depends largely on the model parameters, such as ageing factor, maintenance effectiveness, test efficiency., Authors are grateful to the Spanish Ministry of Science and Innovation for the financial support of this work (Research Project ENE2013-45540-R) and the Doctoral Fellow (BES-2011-043906).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Evaluation of risk impact of Completion Time changes combining PSA and DSA model insight and human reliability analysis

  • Martorell-Aygues, Pablo
  • Marton Lluch, Isabel|||0000-0001-6955-3912
  • Sánchez Galdón, Ana Isabel|||0000-0002-3159-8020
  • Martorell Alsina, Sebastián Salvador|||0000-0003-1706-4740
  • Sanchez Saez, Francisco|||0000-0002-3011-9884
  • Saiz-Córdoba, Matilde
[EN] Although in risk screening of equipment structures, systems and components, changes can be accomplished directly using RG 1.174, a plant change may also include changes to human actions. Human reliability analysis is an integral part of probabilistic safety assessment modeling. Using best estimate codes can identify unknown accident sequences as well as quantify more realistic probabilities of human error. This paper proposes a three-step approach to evaluate the risk impact of changes to completion time within nuclear power plant technical specifications, using a probabilistic safety assessment model refined by a best-estimate safety analysis and human reliability analysis. A case study is presented focusing on a completion time change of the residual heat removal system of a nuclear power plant using a level 1 low power and shutdown probabilistic safety assessment. Thus, the application case shows that the change could be accepted from a risk viewpoint, in particular, because of the risk increase imposed by extending the completion time is partially compensated by the risk decrease due to the human error probability reduction since the stress level is reduced., The authors are grateful to the Spanish Ministry of Science and Innovation for the financial support received (Research Projects ENE2013-45540-R and ENE2016-80401-R) and the doctoral scholarship awarded (BES-2014-067602). The study also received financial support from the Spanish Research Agency and the European Regional Development Fund.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertainties

  • Martorell Alsina, Sebastián Salvador|||0000-0003-1706-4740
  • Marton Lluch, Isabel|||0000-0001-6955-3912
  • Sánchez Galdón, Ana Isabel|||0000-0002-3159-8020
  • Carlos Alberola, Sofía|||0000-0002-0637-325X
  • Villamizar León, Maryory Patricia
This paper presents an approach and an example of application for the evaluation of risk impact of changes to Completion Times within the License Basis of a Nuclear Power Plant based on the use of the Probabilistic Risk Assessment addressing identification, treatment and analysis of uncertainties in an integrated manner. It allows full development of a three tired approach (Tier 1-3) following the principles of the risk-informed decision-making accounting for uncertainties as proposed by many regulators. Completion Time is the maximum outage time a safety related equipment is allowed to be down, e.g. for corrective maintenance, which is established within the Limiting Conditions for Operation included into Technical Specifications for operation of a Nuclear Power Plant. The case study focuses on a Completion Time change of the Accumulators System of a Nuclear Power Plant using a level 1 PRA. It focuses on several sources of model and parameter uncertainties. The results obtained show the risk impact of the proposed a change including both types of epistemic uncertainties is small as compared with current safety goals of concern to Tier 1. However, what concerns to Tier 2 and 3, the results obtained show how the use of some traditional and uncertainty importance measures helps in identifying high risky configurations that should be avoided in NPP technical specifications no matter the duration of CT (Tier 2), and other configurations that could take part of a configuration risk management program (Tier 3)., Authors are grateful to the Spanish Ministry of Science and Innovation for the financial support of this work (Research Project ENE2010-17449 and ENE2013-45540-R).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Unavailability model for demand-caused failures of safety components addressing degradation by demand-induced stress, maintenance effectiveness and test efficiency

  • Martorell-Aygues, Pablo
  • Marton Lluch, Isabel|||0000-0001-6955-3912
  • Sánchez Galdón, Ana Isabel|||0000-0002-3159-8020
  • Martorell Alsina, Sebastián Salvador|||0000-0003-1706-4740
[EN] The reliability, availability and maintainability (RAM) modelling of safety equipment has long been a topic of major concern. Some RAM models have focused on explicitly addressing the effect of component degradation and surveillance and maintenance policies, searching for an optimum level of the safety component RAM by adjusting surveillance and maintenance related parameters. As regards the reliability contribution, these components normally have two main types of failure mode that contribute to the probability of failure on demand (PFD): (1) by demand-caused and (2) standby-related failures. The former is normally associated with a demand failure probability, which is affected by the degradation caused by demand-related stress. Surveillance testing therefore not only introduces a positive effect, but also an adverse one, which it compensates by performing maintenance activities to eliminate or reduce the accumulated degradation. This paper proposes a new model for the demand failure probability that explicitly addresses all aspects of the effect of demand-induced stress (mostly test-induced stress), maintenance effectiveness (PAS or PAR model) and test efficiency. A case study is included on an application to a typical motor-operated valve in a nuclear power plant., The authors are grateful to the Spanish Ministry of Science and Innovation for the financial support received (Research Projects ENE2013-45540-R and ENE2016-80401-R) and the doctoral scholarship awarded (BES-2014-067602). The study also received financial support from the Spanish Research Agency and the European Regional Development Fund.