Pasar al contenido principal

Resultados relacionados

Resultados totales (Incluyendo duplicados): 4
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

The Role of Circular Economy, Technology, and Finance in Green Supply Chain Management: Evidence From Developed Nations

  • Zhang, Jingxiao
  • Hussain, Tufail
  • Skitmore, Martin
  • Shah, Syed Ale Raza
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] This study investigates the determinants of green supply chain management (GSCHM) in nine high-income economies from 2006 to 2022. Using a panel structural equation model, it finds that economic complexity promotes GSCHM, while urbanization constrains it. Unexpectedly, digitalization and artificial intelligence (AI) negatively impact GSCHM, possibly due to poor integration, misaligned strategies, or rebound effects. These technologies also weaken the positive effects of the circular economy (CE), suggesting that digital tools may disrupt sustainability without strategic alignment. Financial depth and stability support GSCHM, whereas financial development and efficiency hinder it, indicating risks from unregulated financial expansion. Targeted green policies are called for-such as mandatory sustainability audits, green finance standards, and digital innovation oversight-led by governments, regulators, and industry bodies. These findings offer actionable insights for aligning economic, technological, and financial systems to strengthen GSCHM and promote long-term sustainability., This study was supported by Shaanxi Social Science Funding, 2023R001; National Science Funding, 71942006; Scientific Research Project of China Road and Bridge Engineering Co. Ltd., No. 2020-zlkj-04.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Dynamic Quality Monitoring System to Assess the Quality of Asphalt Concrete Pavement

  • Ma, Ziyuan
  • Zhang, Jingxiao
  • Philbin, Simon P.
  • Li, Hui
  • Yang, Jie
  • Feng, Yunlong
  • Skitmore, Martin
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] With the rapid development of new technologies, such as big data, the Internet of Things (IoT) and intelligent sensing, the traditional asphalt pavement construction quality evaluation method has been unable to meet the needs of road digital construction. At the same time, the development of such technologies enables a new management system for asphalt pavement construction. In this study, firstly, the dynamic quality monitoring system of asphalt concrete pavement is established by adopting the BeiDou Navigation Satellite System, intelligent sensing, the IoT and 5G technology. This allows key technical indicators to be collected and transmitted for the whole process of asphalt mixture, which includes the mixing plant, transport vehicle, paving and compaction. Secondly, combined with AHP and the entropy weight (EW) method, the index combination weight is calculated. The comprehensive index for the pavement digital construction quality index (PCQ) is proposed to reflect the impact of monitoring indicators on pavement quality. An expert decision-making model is formed by using the improved particle swarm optimization (PSO) algorithm coupled with radial basis function neural network (RBF). Finally, the digital monitoring index and pavement performance index are connected to establish a full-time and multi-dimensional digital construction quality evaluation model. This study is verified by a database created from the digital monitoring data of pavement construction collected from a highway construction project. The system proposed in this study can accurately reflect the quality of pavement digital construction and solve the lag problem existing in the feedback of construction site., This research is supported by the Branch of China Road and Bridge Corporation (Cambodia) Technology Development Project(No.2020-zlkj-04); National Social Science Fund projects (No.20BJY010); National Social Science Fund Post-financing projects (No.19FJYB017); Sichuan-tibet Railway Major Fundamental Science Problems Special Fund (No.71942006); Qinghai Natural Science Foundation (No.2020-JY-736); List of Key Science and Technology Projects in China's Transportation Industry in 2018-International Science and Technology Cooperation Project (No.2018-GH-006 and No.2019-MS5-100); Emerging Engineering Education Research and Practice Project of Ministry of Education of China (No.E-GKRWJC20202914); Shaanxi Social Science Fund (No.2017S004); Xi'an Construction Science and Technology Planning Project (No.SZJJ201915 and No.SZJJ201916); Shaanxi Province Higher Education Teaching Reform Project (No.19BZ016); Fundamental Research for Funds for the Central Universities (Humanities and Social Sciences), Chang'an University (No.300102239616, No.300102281669 and No.300102231641).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Data-Driven Platform Framework for Digital Whole-Process Expressway Construction Management

  • Chen, Shu-Yang
  • Zhang, Jing-Xiao
  • Ni, Qi-Chang
  • Skitmore, Martin
  • Ke, Yong-Jian
  • Zuo, Jian
  • Sun, Hao-Jie
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] To increase the speed and efficiency of expressways construction, information management is being gradually introduced into the construction process. However, progress is limited due to the complexity of expressway engineering and application limitations of information technology. Design and delivery are still dominated by paper files, and the management of test and inspection data is still relatively extensive. Research to date into digital expressway construction has been piecemeal and fragmented with a lack of research related to the whole construction process and a data-centric information management system yet to be realized. In response, through literature research and semi-structured interviews, the framework of a data-driven digital whole-process highway construction management platform was determined. A whole process management platform was established according to the framework, and the functional application of the proposed platform was explained through a case. The framework is proposed from the perspective of the whole process of collaborative sharing., which provides a new way of thinking to solve the problems existing in the current field of expressway construction whole-process management. It also provides data-centric management, electronic design and delivery, a refined workflow, and an efficient management process., This research was supported by the Branch of China Road and Bridge Corporation (Cambodia) Technology Development Project (No. 2020-zlkj-04), National Social Science Fund projects (No. 20BJY010), National Social Science Fund Post-financing projects (No. 19FJYB017), Sichuan-Tibet Railway Major Fundamental Science Problems Special Fund (No. 71942006), List of Key Science and Technology Projects in Chinas Transportation Industry in 2018-International Science and Technology Cooperation Project (No. 2018-GH-006 and No. 2019-MS5-100), Emerging Engineering Education Research and Practice Project of Ministry of Education of China (No. E-GKRWJC20202914), Shaanxi Social Science Fund (No. 2017S004), and Xian Construction Science and Technology Planning Project (Nos. SZJJ201915 and SZJJ201916).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Evaluating the impact of highway construction projects on landscape ecological risks in high altitude plateaus

  • Li, Chao
  • Zhang, Jingxiao
  • Philbin, Simon P.
  • Yang, Xu
  • Dong, Zhanfeng
  • Hong, Jingke
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] In China and other countries, many highway projects are built in extensive and high-altitude flat areas called plateaus. However, research on how the materialisation of these projects produce a series of ecological risks in the landscape is very limited. In this research, a landscape ecological risk analysis model for high-altitude plateaus is proposed. This model is based on the pattern of land uses of the surrounding area. Our study includes buffer analysis, spatial analysis, and geostatistical analysis. We apply the model to the Qumei to Gangba highway, a highway section located in the southeast city of Shigatse at the Chinese Tibet autonomous region. Through global and local spatial autocorrelation analysis, the spatial clustering distribution of ecological risks is also explored. Overall, our study reveals the spatial heterogeneity of ecological risks and how to better mitigate them. According to a comparison of the risk changes in two stages (before and after the highway construction), the impact of highway construction on the ecological environment can be comprehensively quantified. This research will be of interest to construction practitioners seeking to minimize the impact of highway construction projects on the ecological environment. It will also inform future empirical studies in the area of environmental engineering with potential affection to the landscape in high-altitude plateaus., This research is supported by the Branch of China Road and Bridge Corporation (Cambodia) Technology Development Project (No.2020-zlkj-04); National Social Science Fund Projects (No.20BJY010); National Social Science Fund Post-financing Projects (No.19FJYB017); Sichuan-Tibet Railway Major Fundamental Science Problems Special Fund (No.71942006); Qinghai Natural Science Foundation (No. 2020-JY-736); List of Key Science and Technology Projects in China's Transportation Industry in 2018-International Science and Technology Cooperation Project (Nos. 2018-GH-006 and 2019-MS5-100); Emerging Engineering Education Research and Practice Project of Ministry of Education of China (No. E-GKRWJC20202914); Shaanxi Social Science Fund (No. 2017S004); Xi'an Construction Science and Technology Planning Project (Nos. SZJJ201915 and SZJJ201916); Shaanxi Province Higher Education Teaching Reform Project (No. 19BZ016); Fundamental Research for Funds for the Central Universities (Humanities and Social Sciences), Chang'an University (Nos. 300102239616, 300102281669 and 300102231641).