Pasar al contenido principal

OPTIMIZACION DE LA PRODUCCION EN TALLERES HIBRIDOS ENLAZADOS POR UNIDADES EN SECUENCIA

PGC2018-095080-B-I00

•
Nombre agencia financiadora Agencia Estatal de Investigación
Acrónimo agencia financiadora AEI
Programa Programa Estatal de Generación de Conocimiento y Fortalecimiento Científico y Tecnológico del Sistema de I+D+i
Subprograma Subprograma Estatal de Generación de Conocimiento
Convocatoria Proyectos de I+D (Excelencia / Generación de Conocimiento)
Año convocatoria 2018
Plan Estatal 2017-2020 Plan Estatal de Investigación Científica y Técnica y de Innovación
Centro beneficiario UNIVERSITAT POLITECNICA DE CATALUNYA

Resultados relacionados

Resultados totales (Incluyendo duplicados): 39
Encontrada(s) 1 página(s)

UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Evaluación de las sinergias entre lean manufacturing y la Industria 4.0, Assessing the synergies between lean manufacturing and Industry 4.0

  • Fortuny Santos, Jordi|||0000-0001-8106-3385
  • Ruiz-de-Arbulo López, Patxi
  • Luján Blanco, Itziar
  • Chen, Ping-Kuo
El llamado lean manufacturing (también “producción ajustada”, en España) ha sido durante años el modelo de éxito que ha llevado muchas empresas a la excelencia operacional. Sin embargo, los cambios en el mercado que requieren producción personalizada en masa barata parecen estar fuera del alcance de la metodología lean, más pensada para una producción más estable. La Industria 4.0 nace como un sistema prometedor para hacer frente a futuros desafíos en entornos productivos por medio de la automatización y el intercambio de datos gracias a los sistemas ciber-físicos y al Internet de las Cosas. La relación entre lean e industria 4.0 atrae a muchos investigadores en gestión y el número de publicaciones y referencias no para de aumentar con rapidez. No obstante, la falta de aplicaciones reales lleva a trabajos teóricos sobre posibles resultados en multitud de aspectos. El objetivo de este artículo es explorar y evaluar, por medio de una revisión sistemática que llega a setiembre de 2019, el trabajo previo sobre la relación entre lean manufacturing e industria 4.0, para poder entender si ambos enfoques se pueden integrar y si entre los elementos de ambas corrientes existen sinergias. Además, se realiza un estudio bibliométrico. Aunque distintos escenarios son posibles, muchos se refieren a una mejora de las herramientas lean gracias a la información en tiempo real. La mayoría muestra una evolución, no una revolución. El lean ofrece procesos estables que pueden ser automatizados y digitalizados con éxito. De otro modo las nuevas tecnologías no podrán aprovechar los procesos mal gestionados. El papel del personal se ha estudiado poco en los trabajos revisados., This work has been funded by el Ministerio de Ciencia, Innovación y Universidades (Government of Spain) though the OPTHEUS project (ref. PGC2018-095080-B-I00), including European Regional Development Funds (ERDF)., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Data Set: Solución #2 Instancia ASCO#01(2028_5.5): encapsulamiento del combustible nuclear gastado con minimax carga térmica, Data Set: Solution #2 for the Instance ASCO#01(2028_5.5). Encapsulation of spent nuclear fuel with minimax thermal load

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Se presenta la solución #2 para la instancia ASCO#01(2028_5.5) asociada al vaciado de la piscina de la Unidad I de la central nuclear de Ascó, en una sola misión. La fecha supuesta para iniciar las operaciones de la misión es el 1 de septiembre de 2028. La instancia consta de 1253 elementos de combustible nuclear gastado con calores residuales previstos para tal fecha. El problema consiste en transferir todos los elementos combustibles gastados desde la piscina a cápsulas MPC32, atendiendo a dos funciones objetivo en jerarquía: (1) minimizar el número de cápsulas MPC32 (fase-1) y (2) minimizar la máxima potencia térmica en las cápsulas cargadas (fase-2). La solución final requiere 40 cápsulas con carga térmica máxima 𝑄max = 24.0402 kW, la cual se obtiene con IBM CPLEX concediendo un tiempo de CPU igual a 600 s., Solution #2 is presented for the ASCO#01(2028_5.5) instance, associated with the emptying of the pool at Unit 1 of the Ascó nuclear power plant, in a single mission. The estimated date for the start of mission operations is September 1, 2028. The instance consists of 1,253 spent nuclear fuel elements with residual heat expected by that date. The problem is to transfer all spent fuel elements from the pool to MPC32 capsules, taking into account two hierarchical objective functions: (1) minimize the number of MPC32 capsules (phase 1) and (2) minimize the maximum thermal power on the loaded capsules (phase 2). The final solution requires 40 capsules with maximum thermal load 𝑄max = 24.0402 kW, which is obtained with IBM CPLEX granting a CPU time equal to 600 s., Este trabajo ha sido subvencionado por el Ministerio de Ciencia e Innovación del Gobierno de España / FEDER con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00), y por Endesa Generación, S.A., a través del proyecto UPC “Desarrollo de herramientas para la selección del combustible gastado a cargar en contenedores y para optimización de vaciado completo de piscina”, Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Estudio, informe, memoria (Report)

Data Set: CAT/2024.T1 sobre el reparto de escaños entre circunscripciones en el Parlamento de Cataluña (Legislatura 2024-2028), Dataset: CAT/2024.T1 on the apportionment of seats between constituencies in the Parliament of Catalonia (Legislature 2024-2028), Data Set: CAT/2024.T1 sobre el repartiment d'escons entre circumscripcions al Parlament de Catalunya (Legislatura 2024-2028)

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Material suplementario para el artículo: Análisis de la desproporcionalidad del reparto de poder entre territorios. Caso del Parlamento de Cataluña. (2025). Dirección Y Organización, 85, 5-25. https://doi.org/10.37610/85.687, Se presentan los resultados de aplicar los métodos de reparto de escaños de Hamilton, Adams, Dean, Hill, Webster, Jefferson, belga y minimax[e] entre las 4 provincias (circunscripciones) de Cataluña: Barcelona, Tarragona, Girona y Lleida; para ello, se tiene en cuenta tanto la población de cada provincia, para el censo 2024, como la dimensión de la Cámara de representación del Parlament de Catalunya que está constituida por 135 escaños. Se comparan los repartos de escaños ofrecidos por estos métodos con el reparto actual resultante de aplicar el sistema electoral vigente en la comunidad autónoma catalana. Para medir la calidad del reparto equitativo de poder entre territorios se aplican diversas métricas de representatividad territorial parcial y global.
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Planificación y control de stocks del combustible nuclear quemado en centrales nucleares PWR, Planning and control of spent nuclear fuel stocks in PWR nuclear power plants

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
This paper describes the phases of the two epochs of the nuclear fuel lifecycle used in nuclear power plants in Spain, as well as the main characteristics of dry storage of spent fuel elements from PWR-type nuclear reactors. Two mixed-integer linear programming models are presented to optimize the single-mission encapsulation of spent nuclear fuel. Finally, the mathematical models are applied to a hypothetical case of emptying the spent fuel pool at the Ascó nuclear power plant (Tarragona) in 2028., Se describen las fases de las dos épocas del ciclo de vida del combustible nuclear utilizado en centrales nucleares instaladas en España, así como las principales características del almacenaje en seco del stock de elementos combustibles quemados en los reactores nucleares tipo PWR. Se presentan dos modelos de programación lineal entera mixta para optimizar el encap-sulamiento en una sola misión del combustible nuclear quemado. Finalmente, se aplican los modelos matemáticos a un caso hipotético sobre el vaciado de la piscina de la central nuclear de Ascó (Tarragona) en el año 2028., Este trabajo ha sido parcialmente subvencionado por el Ministerio de Ciencia, Innovación y Universidades del Gobierno de España / FEDER a través del proyecto OPTHEUS (ref. PGC2018-095080-B-I00)., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Estudio, informe, memoria (Report)

Soluciones con programación lineal entera mixta para el almacenamiento monoetápico del combustible nuclear gastado en cápsulas MPC-32 en la central nuclear Ascó 1

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
  • Batet Miracle, Lluís|||0000-0003-1882-6313
  • Mateo Doll, Manuel|||0000-0002-3975-9116
Se presentan 7 soluciones con programación lineal entera mixta para el almacenamiento monoetápico del combustible nuclear gastado en cápsulas MPC-32 en una central nuclear. Se emplea la instancia de datos Ascó#01_06 y el solver CPLEX para la asignación de elementos combustibles a regiones térmicas., Se presenta en detalle siete soluciones óptimas para la instancia de datos Ascó#01_06 relacionada con la central nuclear Ascó-1 ubicada a 160 km de Barcelona. El procedimiento utilizado para hallar tales soluciones se despliega en dos fases. En la primera fase, se utiliza el modelo MILP-1 descrito en [2], cuyo objetivo es minimizar el coste de los contenedores requeridos para reubicar el máximo número de elementos combustibles disponibles en la piscina de una central nuclear; el modelo MILP-1, implementado en IBM ILOG CPLEX, sirve para concretar la tipología óptima de los contenedores para el vaciado de la piscina, siendo capaz de resolver instancias con 1200 elementos de combustible nuclear, 6 tipos de regiones térmicas y 4 tipos de contenedores en tiempos de CPU inferiores a 0.5 segundos. En la segunda fase, se emplea un procedimiento exacto (Algoritmo A1) que, partiendo de una solución de MILP-1, ofrece asignaciones óptimas de elementos combustibles a contenedores con 32 posiciones agrupadas en dos regiones con limitaciones máximas del calor residual soportable en cada locus (cápsulas MPC-32); el Algoritmo A1 es capaz de ofrecer una asignación óptima en un tiempo de CPU inferior a 0.25 segundos.
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Análisis de la desproporcionalidad del reparto de poder entre territorios. Caso del Parlamento de Cataluña

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Se analiza la representación de la ciudadanía catalana en el Parlamento de Cataluña correspondiente a cuatro circunscripciones que corresponden a las cuatro provincias de la Comunidad Autónoma. Atendiendo al principio “una persona, un voto” o bien “un representante para el mismo número de personas representadas”, se observa un sesgo significativo entre el reparto actual del poder entre territorios, derivado de la aplicación del sistema electoral vigente, y el reparto resultante al aplicar el principio de proporcionalidad por cuotas de poder en función del número de habitantes de cada circunscripción. Se aplican diversos métodos (Hamilton, Adams, Dean, Hill, Webster, Jefferson y el belga) reconocidos por la comunidad académica para el reparto de escaños en una cámara de representantes y se comparan los resultados ofrecidos por estos con la representación actual de la ciudadanía en el Parlamento de Cataluña2., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Estudio, informe, memoria (Report)

Data Set: CyL/2026.T1 sobre el reparto de escaños entre circunscripciones en las Cortes de Castilla y León (Legislatura 2026-2030), Dataset: CyL/2026.T1 on the distribution of seats between constituencies in the Cortes of Castile and León (Legislature 2026-2030), Datensatz: CyL/2026.T1 zur Sitzverteilung zwischen den Wahlkreisen in den Cortes von Kastilien und León (Legislaturperiode 2026-2030), Ensemble de données : CyL/2026.T1 sur la répartition des sièges entre les circonscriptions des Cortes de Castilla y León (Législature 2026-2030), Data Set: CyL/2026.T1 sobre el repartiment d'escons entre circumscripcions a les Corts de Castella i Lleó (Legislatura 2026-2030)

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Análisis de la desproporcionalidad del reparto de poder entre territorios. Cortes de Castilla y León 2026:, This paper presents the results of applying eight seat allocation methods (Hamilton, Adams, Dean, Hill, Webster, Jefferson, Belgian, and minimax-[e]) to the nine provinces represented in the Cortes of Castile and León: Valladolid, León, Burgos, Salamanca, Zamora, Ávila, Palencia, Segovia, and Soria. The allocation is based on the official municipal register or census in force at the time of the election announcement published in the Official Gazette of Castile and León (BOCYL). The Cortes of Castile and León have 82 seats. The seat allocation proposed by these methods is compared with the current allocation established by the Electoral Law of Castile and León. The quality of the equitable distribution of power among the territories is measured using various metrics of territorial representativeness., Este trabajo ha sido subvencionado por el Ministerio de Ciencia e Innovación del Gobierno de España / FEDER con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00). https://futur.upc.edu/25174771.
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Modelado y resolución del problema del encapsulamiento de combustible nuclear gastado

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
  • Batet Miracle, Lluís|||0000-0003-1882-6313
  • Mateo Doll, Manuel|||0000-0002-3975-9116
En la gestión de residuos de combustible de las centrales nucleares españolas, está previsto activar los almacenes temporales individualizados (ATI) cuando se alcanza la saturación de la piscina destinada a albergar elementos de combustible nuclear gastado durante el periodo de explotación de la instalación; al finalizar dicho periodo, un ATI puede utilizarse como almacén transitorio a corto o largo plazo hasta que el almacén temporal central (ATC) esté disponible. Los elementos combustibles (EC), gastados y ubicados en la piscina de la central nuclear (CN), se seleccionan para su almacenado en seco en contenedores (cápsulas) atendiendo a una serie de restricciones impuestas a cada ATI por el órgano regulador competente en función de los requerimientos que afectan específicamente a los contenedores utilizados (v.gr. la limitación de la carga térmica o el número de posiciones para elementos combustibles). Las características de estas cápsulas condicionan el tiempo mínimo de enfriamiento del combustible en la piscina de la central nuclear y, por consiguiente, el tiempo necesario para completar el vaciado completo de dicha piscina. En este contexto, presentamos el problema del encapsulamiento en una etapa del combustible nuclear gastado, ofreciendo una formulación y un método de resolución en dos fases. En la primera fase, se utiliza un modelo de Programación lineal entera mixta (MILP-1), cuyo objetivo es minimizar el coste de los contenedores (de diverso tipo) que se requieren para reubicar los elementos disponibles en la piscina de una central nuclear. Para la segunda fase se ha implementado un algoritmo exacto (Algoritmo A1) que, partiendo de una solución de MILP-1, determina asignaciones óptimas de elementos a contenedores regionalizados por limitaciones sobre la carga térmica permitida en cada región. El procedimiento conjunto (MILP-1 más A1) es capaz de resolver óptimamente instancias con 1500 elementos combustibles, 6 tipos de regiones térmicas y 4 tipos de contenedores en tiempos de CPU inferiores a 0.75 segundos, repartidos así: 0.5 segundos para MILP-1 más 0.25 segundos para A1.
UPCommons. Portal del coneixement obert de la UPC
Publicación Estudio, informe, memoria (Report)

Data Set: Solución #2 Instancia ASCO#01(2028_5.5). Encapsulamiento del combustible nuclear gastado con minimax carga térmica, Data Set: Solution #2 for the Instance ASCO#01(2028_5.5). Encapsulation of spent nuclear fuel with minimax thermal load

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Se presenta la solución #2 para la instancia ASCO#01(2028_5.5) asociada al vaciado de la piscina de la Unidad I de la central nuclear de Ascó, en una sola misión. La fecha supuesta para iniciar las operaciones de la misión es el 1 de septiembre de 2028. La instancia consta de 1253 elementos de combustible nuclear gastado con calores residuales previstos para tal fecha. El problema consiste en transferir todos los elementos combustibles gastados desde la piscina a cápsulas MPC32, atendiendo a dos funciones objetivo en jerarquía: (1) minimizar el número de cápsulas MPC32 (fase-1) y (2) minimizar la máxima potencia térmica en las cápsulas cargadas (fase-2). La solución final requiere 40 cápsulas con carga térmica máxima Qmax = 24.0402 kW, la cual se obtiene con IBM CPLEX concediendo un tiempo de CPU igual a 600 s., Solution #2 is presented for the ASCO#01(2028_5.5) instance, associated with the emptying of the pool at Unit 1 of the Ascó nuclear power plant, in a single mission. The estimated date for the start of mission operations is September 1, 2028. The instance consists of 1,253 spent nuclear fuel elements with residual heat expected by that date. The problem is to transfer all spent fuel elements from the pool to MPC32 capsules, taking into account two hierarchical objective functions: (1) minimize the number of MPC32 capsules (phase 1) and (2) minimize the maximum thermal power on the loaded capsules (phase 2). The final solution requires 40 capsules with maximum thermal load Qmax = 24.0402 kW, which is obtained with IBM CPLEX granting a CPU time equal to 600 s.
UPCommons. Portal del coneixement obert de la UPC
Publicación Contribución de congreso (ConferenceOutput)

Heijunka and Jidoka in spanish research. A systematic literature review

  • Fortuny Santos, Jordi|||0000-0001-8106-3385
  • Ruíz de Arbulo López, Patxi
After three decades of successful spread of lean production, fundamental practices such as heijunka and jidoka seem rarely mentioned in Spanish forums. This paper explores, through a systematic review of the literature, the scientific production carried out by Spanish researchers related to the heijunka and jidoka methodologies. The papers reveal two strong research streams that allow the technological development of both practices and their application in Industry 4.0. However, further studies are required on industrial settings. The diffusion of both techniques in Spanish manufacturing plants can be felt intuitively, but not enough data are available for their characterization., Acknowledgements. Research funded by Ministry of Science, Innovation and Universities (Spain) though the OPTHEUS project (ref. PGC2018-095080-B-I00), including European Regional Development Funds (ERDF). Many thanks to Dr. Joaquín Bautista., Peer Reviewed, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura::9.5 - Augmentar la investigació científica i millorar la capacitat tecnològica dels sectors industrials de tots els països, en particular els països en desenvolupament, entre d’altres maneres fomentant la innovació i augmentant substancialment, d’aquí al 2030, el nombre de persones que treballen en el camp de la investigació i el desenvolupa­ment per cada milió d’habitants, així com la despesa en investigació i desenvolupament dels sectors públic i privat
UPCommons. Portal del coneixement obert de la UPC
Publicación Estudio, informe, memoria (Report)

Data Set: instancia ASCO#01(2028_5.5) del problema del encapsulamiento de combustible nuclear gastado con optimización minimax y min-SD, Data Set: Instance ASCO#01(2028_5.5) of the spent nuclear fuel encapsulation problem with minimax and min-SD optimization

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
  • Batet Miracle, Lluís|||0000-0003-1882-6313
  • Mateo Doll, Manuel|||0000-0002-3975-9116
Instancia ASCO#01(2028_5.5) para el problema de encapsulamiento del combustible nuclear gastado. Situación en piscina de la central nuclear Ascó en septiembre de 2028 / (ODS 7), En el marco conceptual de la gestión de residuos nucleares radioactivos se presenta la instancia ASCO#01(2028_5.5) correspondiente a una de las últimas fases de la segunda época del ciclo de vida del combustible nuclear utilizado en las centrales nucleares españolas. La instancia está relacionada con un problema de carga en una etapa de contenedores de combustible nuclear gastado, atendiendo a un caso hipotético sobre el futuro de la central nuclear de Ascó en el año 2028.
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Data Set: AND/2026-F1 sobre el reparto de escaños entre fuerzas políticas en el Parlamento de Andalucía (Legislatura 2026-2030), DataSet: AND/2026-F1 on the distribution of seats between political forces in the Parliament of Andalusia (Legislature 2026-2030)

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Se presentan los resultados de aplicar 8 métodos de reparto de escaños (Hamilton, Adams, Dean, Hill, Webster, Jefferson, belga y minimax-[e]) entre las 5 fuerzas políticas representadas en el Parlamento de Andalucía en la Legislatura 2026-2030: PP-A, PSOE-A, VOX, Adelante Andalucía y Por Andalucía. Para el reparto de los 109 escaños que constituyen la cámara de representantes de Andalucía, se han utilizado las cifras oficiales de población resultantes de la revisión del Padrón municipal referidas al 1 de enero de 2025, que fueron declaradas oficiales por el Gobierno de España mediante el Real Decreto 1117/2025, y las cifras de sufragios de la Resolución de la Junta Electoral de Andalucía de 2 de junio de 2026, sobre los resultados de las elecciones al Parlamento de Andalucía celebradas el día 17 de mayo de 2026. Se comparan los repartos de escaños propuestos por tales métodos con el reparto actual que marca la Ley Electoral de Andalucía. La calidad del reparto del poder de forma equitativa entre las fuerzas políticas se mide mediante 15 métricas de desproporcionalidad electoral., This paper presents the results of applying eight seat allocation methods (Hamilton, Adams, Dean, Hill, Webster, Jefferson, Belgian, and minimax-[e]) to the five political parties represented in the Parliament of Andalusia for the 2026-2030 term: PP-A, PSOE-A, VOX, Adelante Andalucía, and Por Andalucía. The allocation of the 109 seats in the Andalusian Parliament was based on official population figures from the revised municipal register as of January 1, 2025, which were declared official by the Spanish Government through Royal Decree 1117/2025, and vote counts from the Resolution of the Andalusian Electoral Board of June 2, 2026, regarding the results of the Andalusian Parliament elections held on May 17, 2026. The seat allocations proposed by these methods are compared with the current allocation established by the Andalusian Electoral Law. The quality of the equitable distribution of power among political forces is measured using 15 metrics of electoral disproportionality., Este trabajo ha sido subvencionado parcialmente por el Ministerio de Ciencia e Innovación del Gobierno de España / FEDER con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00). https://futur.upc.edu/25174771., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Métodos de planificación y secuenciación Heijunka inspirados en el problema del reparto en sistemas electorales

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
El término Heijunka se asocia a la regularidad de la producción, siendo esta una propiedad deseable en todo plan de producción por facilitar la gestión de operaciones y propiciar la reducción de stocks. En este marco conceptual, se establecen tres propiedades deseables que deben cumplir, dentro de lo posible, los planes y las secuencias para ser considerados Heijunka. Estas son: (1) Cuota, (2) Homogeneidad y (3) Monotonía en producción. Tras una introducción sobre el entorno productivo bajo estudio, se formula un programa matemático para obtener planes y secuencias regulares por cuotas de producción y se ofrece una heurística inspirada en el procedimiento de los Restos mayores del Problema del Reparto, la cual se aplica a un ejemplo sobre fabricación de motores. Se definen los conceptos periodicidad ideal de productos y secuenciación regular por fechas idóneas, quedando reflejados en un programa matemático cuyo propósito es determinar secuencias regulares, minimizando las desviaciones (absolutas, cuadráticas, etc.) entre fechas reales e ideales de fabricación. También, se propone la familia de algoritmos Métodos de los Multiplicadores, aplicando algunos de ellos al conjunto de instancias Nissan-9Eng.I. Y se concluye con la idea de que dichos métodos son útiles para secuenciar productos bajo el ideario Heijunka, pues todos ellos verifican al menos dos de las tres propiedades deseables impuestas., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Estudio de la aplicabilidad de lean management en la industria minera

  • Fortuny Santos, Jordi|||0000-0001-8106-3385
  • Ruiz-de-Arbulo López, Patxi
  • Luján Blanco, Itziar
Este trabajo explora, por medio de una revisión sistemática de la literatura, la aplicabilidad de la gestión lean en las empresas mineras. Se observa que la adopción se realiza por la existencia de presiones y como factores determinantes se tienen en cuenta la presencia de agentes facilitadores, la existencia de barreras y los líderes. Se concluye que en grandes empresas de todo el mundo, la implantación previa de otras herramientas de gestión facilita la implantación de las herramientas lean, y que a pesar de las diferencias con otros sectores, es posible mejorar la eficiencia de la industria minera a través de la gestión lean., Esta investigación ha sido subvencionada por el Ministerio de Ciencia, Innovación y Universidades del Gobierno de España con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00), incluyendo Fondos para el desarrollo regional europeo (ERDF: European Regional Development Funds).Una versión previa de este trabajo se presentó en el 14th International Conference on Industrial Engineering and Industrial Management (ICIEIM) & XXIV Congreso de Ingeniería de Organización (CIO2020). Campus de Leganés (Madrid) de la Universidad Carlos III, del 9 al 10 de julio de 2020, Peer Reviewed, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura::9.2 - Promoure una industrialització inclusiva i sostenible i, a tot tardar el 2030, augmentar de manera significativa la contribució de la indústria a l’ocupació i al producte interior brut, d’acord amb les circumstàncies nacionals, i duplicar aquesta contribució als països menys avançats, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura::9.4 - Per a 2030, modernitzar les infraestructures i reconvertir les indústries perquè siguin sostenibles, usant els recursos amb més eficàcia i promovent l’adopció de tecnologies i processos industrials nets i racionals ambiental­ment, i aconseguint que tots els països adoptin mesures d’acord amb les capacitats respectives, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura
UPCommons. Portal del coneixement obert de la UPC
Publicación Capítulo o parte de un libro (BookPart)

Heijunka sequencing on assembly lines with product options, work overload and variable working day length

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
  • Alfaro Pozo, Rocío|||0000-0001-8214-1875
  • Lusa García, Amaia|||0000-0002-1408-6496
This is the accepted manuscript version of the chapter: Bautista, J.; Alfaro, R.; Lusa, A. Heijunka Sequencing on Assembly Lines with Product Options, Work Overload and Variable Working Day Length. In: Data Science, Challenges and Applications in Industrial Operations. Springer, 2026. The final authenticated version is available online at: https://doi.org/10.1007/978-3-032-10126-6_39. © Springer Nature Switzerland AG 2026. This manuscript is made available under the publisher's self-archiving policy., A MILP model is presented for a sequencing problem in assembly lines with product options with minimum workload. Three elements are added to the original model: the production in progress quota property (Heijunka), buffer suppression and variable workday length. The problem is solved with CPLEX solver on 6 Nissan-9Eng.I instances (engines). It is concluded that the elimination of buffers and the reduction in the length of the working day cause a very significant daily loss of engine production, the cost of which varies approximately between 8,400 and 52,000 euros per day, depending on the cycle time c of the assembly line., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Data Set: AND/2026.T1 sobre el reparto de escaños entre circunscripciones en el Parlamento de Andalucía (Legislatura 2026-2030), DataSet: AND/2026.T1 on the distribution of seats between constituencies in the Parliament of Andalusia (Legislature 2026-2030)

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Se presentan los resultados de aplicar 8 métodos de reparto de escaños (Hamilton, Adams, Dean, Hill, Webster, Jefferson, belga y minimax-[e]) entre las 8 provincias representadas en el Parlamento de Andalucía: Almería, Cádiz, Córdoba, Granada, Huelva, Jaén, Málaga y Sevilla. Para hacer el reparto de los 109 escaños que constituyen la cámara de representante de Andalucía, se han utilizado las cifras oficiales de población resultantes de la revisión del Padrón municipal referidas al 1 de enero de 2025, que fueron declaradas oficiales por el Gobierno de España mediante el Real Decreto 1117/2025. Se comparan los repartos de escaños propuestos por tales métodos con el reparto actual que marca la Ley Electoral de Andalucía. La calidad del reparto del poder de forma equitativa entre las provincias se mide mediante 15 métricas de representatividad territorial., This paper presents the results of applying eight seat allocation methods (Hamilton, Adams, Dean, Hill, Webster, Jefferson, Belgian, and minimax-[e]) to the eight provinces represented in the Parliament of Andalusia: Almería, Cádiz, Córdoba, Granada, Huelva, Jaén, Málaga, and Seville. The official population figures resulting from the revision of the Municipal Register as of January 1, 2025, were used to allocate the 109 seats in the Andalusian Parliament. These figures were declared official by the Spanish Government through Royal Decree 1117/2025. The seat allocations proposed by these methods are compared with the current allocation established by the Andalusian Electoral Law. The quality of the equitable distribution of power among the provinces is measured using 15 metrics of territorial representativeness., Este trabajo ha sido subvencionado por el Ministerio de Ciencia e Innovación del Gobierno de España / FEDER con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00). https://futur.upc.edu/25174771, Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Estudio, informe, memoria (Report)

Data Set: N-9E/PRV.1 sobre soluciones instancias Nissan-9Eng.I para el problema PRV con métodos de secuenciación Heijunka, Dataset: N-9E/PRV.1 on solutions of the Nissan-9Eng.I instances for the PRV problem with Heijunka sequencing methods, Data Set: N-9E/PRV.1 sobre solucions instàncies Nissan-9Eng.I pel problema PRV amb mètodes de seqüenciació Heijunka

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Soluciones del SET de instancias Nissan-9Eng.I con el método Restos Mayores modificado y los métodos Multiplicadores de secuenciación Heijunka para el problema PRV., Se recopilan las soluciones para el conjunto de instancias Nissan-9Eng.I, obtenidas con el método Restos Mayores modificado y los métodos Multiplicadores de secuenciación Heijunka aplicados al problema de variación de las tasas de producción (VTP). Se compara el rendimiento de estos métodos utilizando siete métricas sobre la calidad de las soluciones.
UPCommons. Portal del coneixement obert de la UPC
Publicación Capítulo o parte de un libro (BookPart)

Comparative analysis of assembly line balancing models with ergonomics

  • Alfaro Pozo, Rocío|||0000-0001-8214-1875
  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
Assembly lines with a high manual labor component pose a challenge within the framework of the Sustainable Development Goals. Fulfilling Goal 8 requires that such lines be designed not only with economic aspects in mind but also by promoting a safe and secure working environment. Under this approach, a variant of the assembly line balancing problem that limits the harmful workload assigned to stations is introduced. Two mathematical models are formulated: one limiting the number of harmful tasks per station and another limiting the proportion of cycle time allocated to harmful tasks. These models are evaluated through a case study. Results indicate that limiting the proportion of time yields better outcomes in terms of costs and productivity, while ensuring safe line configurations for workers.
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Minimizing the standard deviation of the thermal load in the spent nuclear fuel cask loading problem

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
  • Batet Miracle, Lluís|||0000-0003-1882-6313
  • Mateo Doll, Manuel|||0000-0002-3975-9116
The paper assumes that, at the end of the operational period of a Spanish nuclear power plant, an Independent Spent Fuel Storage Installation will be used for long-term storage. Spent fuel assemblies are selected and transferred to casks for dry storage, with a series of imposed restrictions (e.g., limiting the thermal load). In this context, we present a variant of the problem of spent nuclear fuel cask loading in one stage (i.e., the fuel is completely transferred from the spent fuel pool to the casks at once), offering a multi-start metaheuristic of three phases. (1) A mixed integer linear programming (MILP-1) model is used to minimize the cost of the casks required. (2) A deterministic algorithm (A1) assigns the spent fuel assemblies to a specific region of a specific cask based on an MILP-1 solution. (3) Starting from the A1 solutions, a local search algorithm (A2) minimizes the standard deviation of the thermal load among casks. Instances with 1200 fuel assemblies (and six intervals for the decay heat) are optimally solved by MILP-1 plus A1 in less than one second. Additionally, A2 gets a Pearson’s coefficient of variation lower than 0.75% in less than 260s CPU (1000 iterations), Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Constructive metaheuristics for solving the Car Sequencing Problem under uncertain partial demand

  • Moya Señas, Ignacio
  • Chica Serrano, Manuel|||0000-0002-4717-1056
  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
The car sequencing problem is a well established problem that models the conflicts arising from scheduling cars into an assembly line. However, the existing approaches to this problem do not consider non-regular or out-of-catalog vehicles, which are commonly manufactured in assembly lines. In this paper, we propose a new problem definition that deals with non-regular vehicles. This novel model is called robust Car Sequencing Problem. We model this realistic optimization problem using scenarios defined by different production plans. The problem can be solved by measuring the impact of the plans’ variability and by observing the violations of the problem constraints that appear when switching from one plan to another. In addition to our model formulation, we design and implement a set of constructive metaheuristics to tackle the traditional and the novel robust car sequencing problem. The selected metaheuristics are based on the greedy randomized adaptive search procedure, ant colony optimization, and variable neighborhood search. We have generated compatible instances from the main benchmark in the literature (CSPLib) and we have applied these metaheuristics for solving the new robust problem extension. We complement the experimental study by applying a post hoc statistical analysis for detecting statistically relevant differences between the metaheuristics performance. Our results show that a memetic ant colony optimization with local search is the best method since it performs well for every problem instance regardless of the difficulty of the problem (i.e., constraints and instance size)., Peer Reviewed
UPCommons. Portal del coneixement obert de la UPC
Publicación Artículo científico (JournalArticle)

Exact and heuristic procedures for the Heijunka-flow shop scheduling problem with minimum makespan and job replicas

  • Bautista Valhondo, Joaquín|||0000-0002-2214-4991
In this paper, a new problem of job sequences in a workshop is presented, taking into account non-unit demands for the jobs and whose objective is to minimize the total completion time for all the jobs (Cmax) satisfying a set of restrictions imposed on the problem to preserve the production mix. Two procedures are proposed to solve the new problem: Mixed Integer Linear Programming and a Metaheuristic based on Multistart and Local Search. The two proposed procedures are tested using instance set Nissan-9Eng.I, in both cases giving rise to highly satisfactory performance both in quality of solutions obtained and in the CPU times required. Through a case study of the Nissan engine manufacturing plant in Barcelona, our economic-productive analysis reveals that it is possible to save an average of € 1162.83 per day, manufacturing 270 engines, when we transform the current assembly line into a Heijunka-Flow Shop., Peer Reviewed
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Evaluación de las sinergias entre lean manufacturing y la Industria 4.0, Assessing the synergies between lean manufacturing and Industry 4.0

  • Fortuny Santos, Jordi
  • Ruiz-de-Arbulo López, Patxi
  • Luján Blanco, Itziar
  • Chen, Ping-Kuo
El llamado lean manufacturing (también “producción ajustada”, en España) ha sido durante años el modelo de éxito que ha llevado muchas empresas a la excelencia operacional. Sin embargo, los cambios en el mercado que requieren producción personalizada en masa barata parecen estar fuera del alcance de la metodología lean, más pensada para una producción más estable. La Industria 4.0 nace como un sistema prometedor para hacer frente a futuros desafíos en entornos productivos por medio de la automatización y el intercambio de datos gracias a los sistemas ciber-físicos y al Internet de las Cosas. La relación entre lean e industria 4.0 atrae a muchos investigadores en gestión y el número de publicaciones y referencias no para de aumentar con rapidez. No obstante, la falta de aplicaciones reales lleva a trabajos teóricos sobre posibles resultados en multitud de aspectos. El objetivo de este artículo es explorar y evaluar, por medio de una revisión sistemática que llega a setiembre de 2019, el trabajo previo sobre la relación entre lean manufacturing e industria 4.0, para poder entender si ambos enfoques se pueden integrar y si entre los elementos de ambas corrientes existen sinergias. Además, se realiza un estudio bibliométrico. Aunque distintos escenarios son posibles, muchos se refieren a una mejora de las herramientas lean gracias a la información en tiempo real. La mayoría muestra una evolución, no una revolución. El lean ofrece procesos estables que pueden ser automatizados y digitalizados con éxito. De otro modo las nuevas tecnologías no podrán aprovechar los procesos mal gestionados. El papel del personal se ha estudiado poco en los trabajos revisados., This work has been funded by el Ministerio de Ciencia, Innovación y Universidades (Government of Spain) though the OPTHEUS project (ref. PGC2018-095080-B-I00), including European Regional Development Funds (ERDF)., Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Estudio de la aplicabilidad de lean management en la industria minera

  • Fortuny Santos, Jordi
  • Ruiz-de-Arbulo López, Patxi
  • Luján Blanco, Itziar
Este trabajo explora, por medio de una revisión sistemática de la literatura, la aplicabilidad de la gestión lean en las empresas mineras. Se observa que la adopción se realiza por la existencia de presiones y como factores determinantes se tienen en cuenta la presencia de agentes facilitadores, la existencia de barreras y los líderes. Se concluye que en grandes empresas de todo el mundo, la implantación previa de otras herramientas de gestión facilita la implantación de las herramientas lean, y que a pesar de las diferencias con otros sectores, es posible mejorar la eficiencia de la industria minera a través de la gestión lean., Esta investigación ha sido subvencionada por el Ministerio de Ciencia, Innovación y Universidades del Gobierno de España con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00), incluyendo Fondos para el desarrollo regional europeo (ERDF: European Regional Development Funds).Una versión previa de este trabajo se presentó en el 14th International Conference on Industrial Engineering and Industrial Management (ICIEIM) & XXIV Congreso de Ingeniería de Organización (CIO2020). Campus de Leganés (Madrid) de la Universidad Carlos III, del 9 al 10 de julio de 2020, Peer Reviewed, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura::9.2 - Promoure una industrialització inclusiva i sostenible i, a tot tardar el 2030, augmentar de manera significativa la contribució de la indústria a l’ocupació i al producte interior brut, d’acord amb les circumstàncies nacionals, i duplicar aquesta contribució als països menys avançats, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura::9.4 - Per a 2030, modernitzar les infraestructures i reconvertir les indústries perquè siguin sostenibles, usant els recursos amb més eficàcia i promovent l’adopció de tecnologies i processos industrials nets i racionals ambiental­ment, i aconseguint que tots els països adoptin mesures d’acord amb les capacitats respectives, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Constructive metaheuristics for solving the Car Sequencing Problem under uncertain partial demand

  • Moya Señas, Ignacio
  • Chica Serrano, Manuel
  • Bautista Valhondo, Joaquín
The car sequencing problem is a well established problem that models the conflicts arising from scheduling cars into an assembly line. However, the existing approaches to this problem do not consider non-regular or out-of-catalog vehicles, which are commonly manufactured in assembly lines. In this paper, we propose a new problem definition that deals with non-regular vehicles. This novel model is called robust Car Sequencing Problem. We model this realistic optimization problem using scenarios defined by different production plans. The problem can be solved by measuring the impact of the plans’ variability and by observing the violations of the problem constraints that appear when switching from one plan to another. In addition to our model formulation, we design and implement a set of constructive metaheuristics to tackle the traditional and the novel robust car sequencing problem. The selected metaheuristics are based on the greedy randomized adaptive search procedure, ant colony optimization, and variable neighborhood search. We have generated compatible instances from the main benchmark in the literature (CSPLib) and we have applied these metaheuristics for solving the new robust problem extension. We complement the experimental study by applying a post hoc statistical analysis for detecting statistically relevant differences between the metaheuristics performance. Our results show that a memetic ant colony optimization with local search is the best method since it performs well for every problem instance regardless of the difficulty of the problem (i.e., constraints and instance size)., Peer Reviewed, Postprint (author's final draft)
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Análisis de la desproporcionalidad del reparto de poder entre territorios. Caso del Parlamento de Cataluña

  • Bautista Valhondo, Joaquín
Se analiza la representación de la ciudadanía catalana en el Parlamento de Cataluña correspondiente a cuatro circunscripciones que corresponden a las cuatro provincias de la Comunidad Autónoma. Atendiendo al principio “una persona, un voto” o bien “un representante para el mismo número de personas representadas”, se observa un sesgo significativo entre el reparto actual del poder entre territorios, derivado de la aplicación del sistema electoral vigente, y el reparto resultante al aplicar el principio de proporcionalidad por cuotas de poder en función del número de habitantes de cada circunscripción. Se aplican diversos métodos (Hamilton, Adams, Dean, Hill, Webster, Jefferson y el belga) reconocidos por la comunidad académica para el reparto de escaños en una cámara de representantes y se comparan los resultados ofrecidos por estos con la representación actual de la ciudadanía en el Parlamento de Cataluña2., Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Métodos de planificación y secuenciación Heijunka inspirados en el problema del reparto en sistemas electorales

  • Bautista Valhondo, Joaquín
El término Heijunka se asocia a la regularidad de la producción, siendo esta una propiedad deseable en todo plan de producción por facilitar la gestión de operaciones y propiciar la reducción de stocks. En este marco conceptual, se establecen tres propiedades deseables que deben cumplir, dentro de lo posible, los planes y las secuencias para ser considerados Heijunka. Estas son: (1) Cuota, (2) Homogeneidad y (3) Monotonía en producción. Tras una introducción sobre el entorno productivo bajo estudio, se formula un programa matemático para obtener planes y secuencias regulares por cuotas de producción y se ofrece una heurística inspirada en el procedimiento de los Restos mayores del Problema del Reparto, la cual se aplica a un ejemplo sobre fabricación de motores. Se definen los conceptos periodicidad ideal de productos y secuenciación regular por fechas idóneas, quedando reflejados en un programa matemático cuyo propósito es determinar secuencias regulares, minimizando las desviaciones (absolutas, cuadráticas, etc.) entre fechas reales e ideales de fabricación. También, se propone la familia de algoritmos Métodos de los Multiplicadores, aplicando algunos de ellos al conjunto de instancias Nissan-9Eng.I. Y se concluye con la idea de que dichos métodos son útiles para secuenciar productos bajo el ideario Heijunka, pues todos ellos verifican al menos dos de las tres propiedades deseables impuestas., Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Exact and heuristic procedures for the Heijunka-flow shop scheduling problem with minimum makespan and job replicas

  • Bautista Valhondo, Joaquín
In this paper, a new problem of job sequences in a workshop is presented, taking into account non-unit demands for the jobs and whose objective is to minimize the total completion time for all the jobs (Cmax) satisfying a set of restrictions imposed on the problem to preserve the production mix. Two procedures are proposed to solve the new problem: Mixed Integer Linear Programming and a Metaheuristic based on Multistart and Local Search. The two proposed procedures are tested using instance set Nissan-9Eng.I, in both cases giving rise to highly satisfactory performance both in quality of solutions obtained and in the CPU times required. Through a case study of the Nissan engine manufacturing plant in Barcelona, our economic-productive analysis reveals that it is possible to save an average of € 1162.83 per day, manufacturing 270 engines, when we transform the current assembly line into a Heijunka-Flow Shop., Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Data Set: CAT/2024.T1 sobre el reparto de escaños entre circunscripciones en el Parlamento de Cataluña (Legislatura 2024-2028), Dataset: CAT/2024.T1 on the apportionment of seats between constituencies in the Parliament of Catalonia (Legislature 2024-2028), Data Set: CAT/2024.T1 sobre el repartiment d'escons entre circumscripcions al Parlament de Catalunya (Legislatura 2024-2028)

  • Bautista Valhondo, Joaquín
Material suplementario para el artículo: Análisis de la desproporcionalidad del reparto de poder entre territorios. Caso del Parlamento de Cataluña. (2025). Dirección Y Organización, 85, 5-25. https://doi.org/10.37610/85.687, Se presentan los resultados de aplicar los métodos de reparto de escaños de Hamilton, Adams, Dean, Hill, Webster, Jefferson, belga y minimax[e] entre las 4 provincias (circunscripciones) de Cataluña: Barcelona, Tarragona, Girona y Lleida; para ello, se tiene en cuenta tanto la población de cada provincia, para el censo 2024, como la dimensión de la Cámara de representación del Parlament de Catalunya que está constituida por 135 escaños. Se comparan los repartos de escaños ofrecidos por estos métodos con el reparto actual resultante de aplicar el sistema electoral vigente en la comunidad autónoma catalana. Para medir la calidad del reparto equitativo de poder entre territorios se aplican diversas métricas de representatividad territorial parcial y global., Preprint
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Planificación y control de stocks del combustible nuclear quemado en centrales nucleares PWR, Planning and control of spent nuclear fuel stocks in PWR nuclear power plants

  • Bautista Valhondo, Joaquín
This paper describes the phases of the two epochs of the nuclear fuel lifecycle used in nuclear power plants in Spain, as well as the main characteristics of dry storage of spent fuel elements from PWR-type nuclear reactors. Two mixed-integer linear programming models are presented to optimize the single-mission encapsulation of spent nuclear fuel. Finally, the mathematical models are applied to a hypothetical case of emptying the spent fuel pool at the Ascó nuclear power plant (Tarragona) in 2028., Se describen las fases de las dos épocas del ciclo de vida del combustible nuclear utilizado en centrales nucleares instaladas en España, así como las principales características del almacenaje en seco del stock de elementos combustibles quemados en los reactores nucleares tipo PWR. Se presentan dos modelos de programación lineal entera mixta para optimizar el encap-sulamiento en una sola misión del combustible nuclear quemado. Finalmente, se aplican los modelos matemáticos a un caso hipotético sobre el vaciado de la piscina de la central nuclear de Ascó (Tarragona) en el año 2028., Este trabajo ha sido parcialmente subvencionado por el Ministerio de Ciencia, Innovación y Universidades del Gobierno de España / FEDER a través del proyecto OPTHEUS (ref. PGC2018-095080-B-I00)., Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Heijunka sequencing on assembly lines with product options, work overload and variable working day length

  • Bautista Valhondo, Joaquín
  • Alfaro Pozo, Rocío
  • Lusa García, Amaia
This is the accepted manuscript version of the chapter: Bautista, J.; Alfaro, R.; Lusa, A. Heijunka Sequencing on Assembly Lines with Product Options, Work Overload and Variable Working Day Length. In: Data Science, Challenges and Applications in Industrial Operations. Springer, 2026. The final authenticated version is available online at: https://doi.org/10.1007/978-3-032-10126-6_39. © Springer Nature Switzerland AG 2026. This manuscript is made available under the publisher's self-archiving policy., A MILP model is presented for a sequencing problem in assembly lines with product options with minimum workload. Three elements are added to the original model: the production in progress quota property (Heijunka), buffer suppression and variable workday length. The problem is solved with CPLEX solver on 6 Nissan-9Eng.I instances (engines). It is concluded that the elimination of buffers and the reduction in the length of the working day cause a very significant daily loss of engine production, the cost of which varies approximately between 8,400 and 52,000 euros per day, depending on the cycle time c of the assembly line., Peer Reviewed, Postprint (author's final draft)
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Data Set: instancia ASCO#01(2028_5.5) del problema del encapsulamiento de combustible nuclear gastado con optimización minimax y min-SD, Data Set: Instance ASCO#01(2028_5.5) of the spent nuclear fuel encapsulation problem with minimax and min-SD optimization

  • Bautista Valhondo, Joaquín
  • Batet Miracle, Lluís
  • Mateo Doll, Manuel
Instancia ASCO#01(2028_5.5) para el problema de encapsulamiento del combustible nuclear gastado. Situación en piscina de la central nuclear Ascó en septiembre de 2028 / (ODS 7), En el marco conceptual de la gestión de residuos nucleares radioactivos se presenta la instancia ASCO#01(2028_5.5) correspondiente a una de las últimas fases de la segunda época del ciclo de vida del combustible nuclear utilizado en las centrales nucleares españolas. La instancia está relacionada con un problema de carga en una etapa de contenedores de combustible nuclear gastado, atendiendo a un caso hipotético sobre el futuro de la central nuclear de Ascó en el año 2028., Preprint
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Data Set: Solución #2 Instancia ASCO#01(2028_5.5). Encapsulamiento del combustible nuclear gastado con minimax carga térmica, Data Set: Solution #2 for the Instance ASCO#01(2028_5.5). Encapsulation of spent nuclear fuel with minimax thermal load

  • Bautista Valhondo, Joaquín
Se presenta la solución #2 para la instancia ASCO#01(2028_5.5) asociada al vaciado de la piscina de la Unidad I de la central nuclear de Ascó, en una sola misión. La fecha supuesta para iniciar las operaciones de la misión es el 1 de septiembre de 2028. La instancia consta de 1253 elementos de combustible nuclear gastado con calores residuales previstos para tal fecha. El problema consiste en transferir todos los elementos combustibles gastados desde la piscina a cápsulas MPC32, atendiendo a dos funciones objetivo en jerarquía: (1) minimizar el número de cápsulas MPC32 (fase-1) y (2) minimizar la máxima potencia térmica en las cápsulas cargadas (fase-2). La solución final requiere 40 cápsulas con carga térmica máxima Qmax = 24.0402 kW, la cual se obtiene con IBM CPLEX concediendo un tiempo de CPU igual a 600 s., Solution #2 is presented for the ASCO#01(2028_5.5) instance, associated with the emptying of the pool at Unit 1 of the Ascó nuclear power plant, in a single mission. The estimated date for the start of mission operations is September 1, 2028. The instance consists of 1,253 spent nuclear fuel elements with residual heat expected by that date. The problem is to transfer all spent fuel elements from the pool to MPC32 capsules, taking into account two hierarchical objective functions: (1) minimize the number of MPC32 capsules (phase 1) and (2) minimize the maximum thermal power on the loaded capsules (phase 2). The final solution requires 40 capsules with maximum thermal load Qmax = 24.0402 kW, which is obtained with IBM CPLEX granting a CPU time equal to 600 s., Preprint
Recercat. Dipósit de la Recerca de Catalunya
Publicación Contribución de congreso (ConferenceOutput)

Heijunka and Jidoka in spanish research. A systematic literature review

  • Fortuny Santos, Jordi
  • Ruíz de Arbulo López, Patxi
After three decades of successful spread of lean production, fundamental practices such as heijunka and jidoka seem rarely mentioned in Spanish forums. This paper explores, through a systematic review of the literature, the scientific production carried out by Spanish researchers related to the heijunka and jidoka methodologies. The papers reveal two strong research streams that allow the technological development of both practices and their application in Industry 4.0. However, further studies are required on industrial settings. The diffusion of both techniques in Spanish manufacturing plants can be felt intuitively, but not enough data are available for their characterization., Acknowledgements. Research funded by Ministry of Science, Innovation and Universities (Spain) though the OPTHEUS project (ref. PGC2018-095080-B-I00), including European Regional Development Funds (ERDF). Many thanks to Dr. Joaquín Bautista., Peer Reviewed, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura, Objectius de Desenvolupament Sostenible::9 - Indústria, Innovació i Infraestructura::9.5 - Augmentar la investigació científica i millorar la capacitat tecnològica dels sectors industrials de tots els països, en particular els països en desenvolupament, entre d’altres maneres fomentant la innovació i augmentant substancialment, d’aquí al 2030, el nombre de persones que treballen en el camp de la investigació i el desenvolupa­ment per cada milió d’habitants, així com la despesa en investigació i desenvolupament dels sectors públic i privat, Postprint (author's final draft)
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Data Set: N-9E/PRV.1 sobre soluciones instancias Nissan-9Eng.I para el problema PRV con métodos de secuenciación Heijunka, Dataset: N-9E/PRV.1 on solutions of the Nissan-9Eng.I instances for the PRV problem with Heijunka sequencing methods, Data Set: N-9E/PRV.1 sobre solucions instàncies Nissan-9Eng.I pel problema PRV amb mètodes de seqüenciació Heijunka

  • Bautista Valhondo, Joaquín
Soluciones del SET de instancias Nissan-9Eng.I con el método Restos Mayores modificado y los métodos Multiplicadores de secuenciación Heijunka para el problema PRV., Se recopilan las soluciones para el conjunto de instancias Nissan-9Eng.I, obtenidas con el método Restos Mayores modificado y los métodos Multiplicadores de secuenciación Heijunka aplicados al problema de variación de las tasas de producción (VTP). Se compara el rendimiento de estos métodos utilizando siete métricas sobre la calidad de las soluciones., Preprint
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Soluciones con programación lineal entera mixta para el almacenamiento monoetápico del combustible nuclear gastado en cápsulas MPC-32 en la central nuclear Ascó 1

  • Bautista Valhondo, Joaquín
  • Batet Miracle, Lluís
  • Mateo Doll, Manuel
Se presentan 7 soluciones con programación lineal entera mixta para el almacenamiento monoetápico del combustible nuclear gastado en cápsulas MPC-32 en una central nuclear. Se emplea la instancia de datos Ascó#01_06 y el solver CPLEX para la asignación de elementos combustibles a regiones térmicas., Se presenta en detalle siete soluciones óptimas para la instancia de datos Ascó#01_06 relacionada con la central nuclear Ascó-1 ubicada a 160 km de Barcelona. El procedimiento utilizado para hallar tales soluciones se despliega en dos fases. En la primera fase, se utiliza el modelo MILP-1 descrito en [2], cuyo objetivo es minimizar el coste de los contenedores requeridos para reubicar el máximo número de elementos combustibles disponibles en la piscina de una central nuclear; el modelo MILP-1, implementado en IBM ILOG CPLEX, sirve para concretar la tipología óptima de los contenedores para el vaciado de la piscina, siendo capaz de resolver instancias con 1200 elementos de combustible nuclear, 6 tipos de regiones térmicas y 4 tipos de contenedores en tiempos de CPU inferiores a 0.5 segundos. En la segunda fase, se emplea un procedimiento exacto (Algoritmo A1) que, partiendo de una solución de MILP-1, ofrece asignaciones óptimas de elementos combustibles a contenedores con 32 posiciones agrupadas en dos regiones con limitaciones máximas del calor residual soportable en cada locus (cápsulas MPC-32); el Algoritmo A1 es capaz de ofrecer una asignación óptima en un tiempo de CPU inferior a 0.25 segundos., Preprint
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Comparative analysis of assembly line balancing models with ergonomics

  • Alfaro Pozo, Rocío
  • Bautista Valhondo, Joaquín
Assembly lines with a high manual labor component pose a challenge within the framework of the Sustainable Development Goals. Fulfilling Goal 8 requires that such lines be designed not only with economic aspects in mind but also by promoting a safe and secure working environment. Under this approach, a variant of the assembly line balancing problem that limits the harmful workload assigned to stations is introduced. Two mathematical models are formulated: one limiting the number of harmful tasks per station and another limiting the proportion of cycle time allocated to harmful tasks. These models are evaluated through a case study. Results indicate that limiting the proportion of time yields better outcomes in terms of costs and productivity, while ensuring safe line configurations for workers., Postprint (author's final draft)
Recercat. Dipósit de la Recerca de Catalunya
Publicación

Data Set: CyL/2026.T1 sobre el reparto de escaños entre circunscripciones en las Cortes de Castilla y León (Legislatura 2026-2030), Dataset: CyL/2026.T1 on the distribution of seats between constituencies in the Cortes of Castile and León (Legislature 2026-2030), Datensatz: CyL/2026.T1 zur Sitzverteilung zwischen den Wahlkreisen in den Cortes von Kastilien und León (Legislaturperiode 2026-2030), Ensemble de données : CyL/2026.T1 sur la répartition des sièges entre les circonscriptions des Cortes de Castilla y León (Législature 2026-2030), Data Set: CyL/2026.T1 sobre el repartiment d'escons entre circumscripcions a les Corts de Castella i Lleó (Legislatura 2026-2030)

  • Bautista Valhondo, Joaquín
Análisis de la desproporcionalidad del reparto de poder entre territorios. Cortes de Castilla y León 2026:, This paper presents the results of applying eight seat allocation methods (Hamilton, Adams, Dean, Hill, Webster, Jefferson, Belgian, and minimax-[e]) to the nine provinces represented in the Cortes of Castile and León: Valladolid, León, Burgos, Salamanca, Zamora, Ávila, Palencia, Segovia, and Soria. The allocation is based on the official municipal register or census in force at the time of the election announcement published in the Official Gazette of Castile and León (BOCYL). The Cortes of Castile and León have 82 seats. The seat allocation proposed by these methods is compared with the current allocation established by the Electoral Law of Castile and León. The quality of the equitable distribution of power among the territories is measured using various metrics of territorial representativeness., Este trabajo ha sido subvencionado por el Ministerio de Ciencia e Innovación del Gobierno de España / FEDER con el proyecto OPTHEUS (ref. PGC2018-095080-B-I00). https://futur.upc.edu/25174771., Preprint
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Minimizing the standard deviation of the thermal load in the spent nuclear fuel cask loading problem

  • Bautista Valhondo, Joaquín
  • Batet Miracle, Lluís
  • Mateo Doll, Manuel
The paper assumes that, at the end of the operational period of a Spanish nuclear power plant, an Independent Spent Fuel Storage Installation will be used for long-term storage. Spent fuel assemblies are selected and transferred to casks for dry storage, with a series of imposed restrictions (e.g., limiting the thermal load). In this context, we present a variant of the problem of spent nuclear fuel cask loading in one stage (i.e., the fuel is completely transferred from the spent fuel pool to the casks at once), offering a multi-start metaheuristic of three phases. (1) A mixed integer linear programming (MILP-1) model is used to minimize the cost of the casks required. (2) A deterministic algorithm (A1) assigns the spent fuel assemblies to a specific region of a specific cask based on an MILP-1 solution. (3) Starting from the A1 solutions, a local search algorithm (A2) minimizes the standard deviation of the thermal load among casks. Instances with 1200 fuel assemblies (and six intervals for the decay heat) are optimally solved by MILP-1 plus A1 in less than one second. Additionally, A2 gets a Pearson’s coefficient of variation lower than 0.75% in less than 260s CPU (1000 iterations), Peer Reviewed, Postprint (published version)
Recercat. Dipósit de la Recerca de Catalunya
Publicación Artículo científico (JournalArticle)

Modelado y resolución del problema del encapsulamiento de combustible nuclear gastado

  • Bautista Valhondo, Joaquín
  • Batet Miracle, Lluís
  • Mateo Doll, Manuel
En la gestión de residuos de combustible de las centrales nucleares españolas, está previsto activar los almacenes temporales individualizados (ATI) cuando se alcanza la saturación de la piscina destinada a albergar elementos de combustible nuclear gastado durante el periodo de explotación de la instalación; al finalizar dicho periodo, un ATI puede utilizarse como almacén transitorio a corto o largo plazo hasta que el almacén temporal central (ATC) esté disponible. Los elementos combustibles (EC), gastados y ubicados en la piscina de la central nuclear (CN), se seleccionan para su almacenado en seco en contenedores (cápsulas) atendiendo a una serie de restricciones impuestas a cada ATI por el órgano regulador competente en función de los requerimientos que afectan específicamente a los contenedores utilizados (v.gr. la limitación de la carga térmica o el número de posiciones para elementos combustibles). Las características de estas cápsulas condicionan el tiempo mínimo de enfriamiento del combustible en la piscina de la central nuclear y, por consiguiente, el tiempo necesario para completar el vaciado completo de dicha piscina. En este contexto, presentamos el problema del encapsulamiento en una etapa del combustible nuclear gastado, ofreciendo una formulación y un método de resolución en dos fases. En la primera fase, se utiliza un modelo de Programación lineal entera mixta (MILP-1), cuyo objetivo es minimizar el coste de los contenedores (de diverso tipo) que se requieren para reubicar los elementos disponibles en la piscina de una central nuclear. Para la segunda fase se ha implementado un algoritmo exacto (Algoritmo A1) que, partiendo de una solución de MILP-1, determina asignaciones óptimas de elementos a contenedores regionalizados por limitaciones sobre la carga térmica permitida en cada región. El procedimiento conjunto (MILP-1 más A1) es capaz de resolver óptimamente instancias con 1500 elementos combustibles, 6 tipos de regiones térmicas y 4 tipos de contenedores en tiempos de CPU inferiores a 0.75 segundos, repartidos así: 0.5 segundos para MILP-1 más 0.25 segundos para A1., Postprint (published version)