Pasar al contenido principal

Resultados relacionados

Resultados totales (Incluyendo duplicados): 2
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Stability and accuracy of deterministic project duration forecasting methods in earned value management

  • Barrientos-Orellana, Alexis
  • Mora-Melià, Daniel
  • Vanhoucke, Mario
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
  • González-Cruz, María-Carmen|||0000-0002-6987-5732
[EN] Purpose Earned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting methods have been proposed. However, very few studies have compared their accuracy and stability. Design/methodology/approach This paper presents an exhaustive stability and accuracy analysis of 27 deterministic EVM project duration forecasting methods. Stability is measured via Pearson's, Spearman's and Kendall's correlation coefficients while accuracy is measured by Mean Squared and Mean Absolute Percentage Errors. These parameters are determined at ten percentile intervals to track a given project's progress across 4,100 artificial project networks with varied topologies. Findings Findings support that stability and accuracy are inversely correlated for most forecasting methods, and also suggest that both significantly worsen as project networks become increasingly parallel. However, the AT + PD-ESmin forecasting method stands out as being the most accurate and reliable. Practical implications Implications of this study will allow construction project managers to resort to the simplest, most accurate and most stable EVM metrics when forecasting project duration. They will also be able to anticipate how the project topology (i.e., the network of activity predecessors) and the stage of project progress can condition their accuracy and stability. Originality/value Unlike previous research comparing EVM forecasting methods, this one includes all deterministic methods (classical and recent alike) and measures their performance in accordance with several parameters. Activity durations and costs are also modelled akin to those of construction projects., The first author acknowledges the University of Talca for his Doctoral Program Scholarship (RU-056-2019). The second author acknowledges the Spanish Ministry of Science and Innovation for his Ramon y Cajal contract (RYC-2017-22222) co-funded by the European Social Fund.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management

  • Barrientos-Orellana, Alexis
  • Mora-Meliá, Daniel
  • Cerezo-Narváez, Alberto
  • Gutiérrez-Bahamondes, Jimmy H.
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] Completing a project on time and on budget are essential factors for the success of any project. One technique that allows predicting the final cost of a project is earned value management (EVM). In this technique, different mathematical methods for predicting the final project cost have been proposed over the last 30 years. These formulas make use of activities¿ actual costs and durations as the project progresses. EVM is a technique widely used by many project management professionals. However, very few studies have compared the stability and accuracy of the multiple existing methods for predicting the final cost of the project (commonly abbreviated as estimated cost at completion, EAC). This study compares the stability and accuracy of 30 deterministic cost prediction methods (EAC) in EVM. For this purpose, a representative database of 4100 simulated projects of various topological structures is used. Our results suggest that the methods with the simplest mathematical configurations achieve better stability and accuracy performance. Knowing which EVM methods are the most stable and accurate for predicting the final cost of the project will help project practitioners choose the most reliable cost prediction techniques when they are managing their own projects in real contexts., This research was funded by the Program Fondecyt Regular, grant number 1210410. It was also funded by the Ministry of Universities (Spain) and the Program European Union Next Generation EU. The first author would like to thank the Universidad de Talca for his grant from the Programa de Doctorado en Sistemas de Ingeniería (RU-056-2019).