RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Use of Low-Cost Devices for the Control and Monitoring of CO2 Concentration in Existing Buildings after the COVID Era

  • Pastor-Fernández, Andrés
  • Cerezo-Narváez, Alberto
  • Montero-Gutiérrez, Paz
  • Otero-Mateo, Manuel
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] In the COVID-19 era, a direct relationship has been consolidated between the concentration of the pollutant carbon dioxide (CO2) and indoor disease transmission. For reducing its spread, recommendations have been established among which air renewal is a key element to improve indoor air quality (IAQ). In this study, a low-cost CO2 measurement device was designed, developed, assembled, prototyped, and openly programmed so that the IAQ can be monitored remotely. In addition, this clonic device was calibrated for correct data acquisition. In parallel, computational fluid dynamics (CFD) modeling analysis was used to study the indoor air flows to eliminate non-representative singular measurement points, providing possible locations. The results in four scenarios (cross ventilation, outdoor ventilation, indoor ventilation, and no ventilation) showed that the measurements provided by the clonic device are comparable to those obtained by laboratory instruments, with an average error of less than 3%. These data collected wirelessly for interpretation were evaluated on an Internet of Things (IoT) platform in real time or deferred. As a result, remaining lifespan of buildings can be exploited interconnecting IAQ devices with other systems (as HVAC systems) in an IoT environment. This can transform them into smart buildings, adding value to their refurbishment and modernization., All authors acknowledge the help received by the research group TEP-955 from the PAIDI, the ERGOMET Project of the Program for the Promotion of Research Activity of the UCA, the Project "Design of a low-cost non-invasive ergonomic capture system for the analysis of musculoskeletal disorders" of the Program for the Promotion of Research and Transfer of the UCA and the National Plan Research Project PID2019-108669RB-100/AEI/10.13039/501100011033.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Duration and Cost Variability of Construction Activities: An Empirical Study

  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
  • González-Cruz, María-Carmen|||0000-0002-6987-5732
  • Sanz-Ablanedo, E.
  • Soetanto, R.
  • Larsen, G.D.
  • Cerezo-Narváez, A.
[EN] The unique nature of construction projects can mean that construction activities often suffer from duration and cost variability. Because this variability is unplanned, it can present a problem when attempting to complete a project on time and on budget. Various factors causing this variability have been identified in the literature, but they predominantly refer to the nature and/or context of the whole project rather than specific activities. In this paper, the order of magnitude of and correlation between activity duration and cost variability is analyzed in 101 construction projects with over 5,000 activities. To do this, the first four moments (mean, standard deviation, skewness, and kurtosis) of actual versus planned duration and cost (log) ratios are analyzed by project, phase of execution, and activity type. Results suggest that, contrary to common wisdom, construction activities do not end late on average. Instead, the large variability in the activity duration is the major factor causing significant project delays and cost overruns. The values of average activity duration and cost variability gathered in this study will also serve as a reference for construction managers to improve future construction planning and project simulation studies with more realistic data., The first author acknowledges the Spanish Ministry of Science, Innovation and Universities for his Ramon y Cajal contract (RYC-2017-22222) cofunded by the European Social Fund. This work was also supported by the second author's "Estancias de movilidad en el extranjero Jose Castillejo para jovenes doctores, 2017 (Grant Ref. CAS17/00488)" and the fourth author's "Estancias de profesores e investigadores senior en centros extranjeros Salvador de Madariaga 2018 (Grant Ref. PRX18/00381)," both from the Spanish Ministry of Science, Innovation and Universities. The first and last authors also acknowledge the help received by the research group TEP-955 from the PAIDI (Junta de Andalucia, Spain).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

Performance comparison of activity sensitivity metrics in schedule risk analysis

  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
  • Cerezo-Narváez, Alberto
  • Otero-Mateo, Manuel
  • Pastor-Fernández, Andrés
  • Vanhoucke, Mario
[EN] In Schedule Risk Analysis (SRA), activity sensitivity metrics measure the importance of activities in a project schedule. Highly sensitive activities are those more likely to increase project duration variability and/or cause project duration extensions. Several activity sensitivity metrics have been proposed over the years, but a comparison of all of them has never been made. This has made it difficult to know which metrics perform better and under what circumstances. In this paper, an extensive comparison of all relevant SRA activity sensitivity metrics is performed using a set of 4100 artificial projects. Unlike previous studies, the comparison framework is decoupled from corrective actions (e.g. activity crashing) which allows the merits of each metric to be assessed individually. Additionally, a new metric that performs better for overall sensitivity ranking is proposed. Results show that most sensitivity metrics do not perform well unless they are applied iteratively (the sensitivity of the remaining scheduled activities has to be recalculated whenever the duration variability of at least one activity has been restricted). However, if applied iteratively, most metrics can enhance project monitoring and control, while significantly shortening project duration., The first author acknowledges the Spanish Ministry of Science, Innovation and Universities for his Ramon y Cajal contract (RYC-2017-22222) co-funded by the European Social Fund. The first four authors also acknowledge the help received by the research group TEP-955 from the PAIDI (Junta de Andalucia, Spain).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

The Influence of Knowledge on Managing Risk for the Success in Complex Construction Projects: The IPMA Approach

  • Cerezo-Narváez, Alberto
  • Pastor-Fernández, Andrés
  • Otero-Mateo, Manuel
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] Organizations undertaking construction projects often deal with uncertainty and complexity. Risks include a wide range of occurrences that can lead to project failure. However, these difficulties may be minimized if risks are properly managed. In addition, knowledge management may emerge as a key element in facing unforeseen events and detecting the actions that are working well in other projects. In this context, this study intends to demonstrate the influence of managing organizational knowledge on risk management and the impact of both on the success of projects and associated businesses. To this end, a questionnaire was distributed among construction technicians, practitioners and managers in order to assess the importance of factors managing knowledge and risk and of success criteria. Thanks to the participation of almost four hundred respondents, cause-and-effect relationships are characterized by means of structural equation modeling, statistically confirming them. The specific links between the knowledge-management projects and the skills and abilities to face risks provided by the International Project Management Association (IPMA) standards, with a relation of 0.892 out of 1, justify the 75.1% of the success of the venture. These findings prove that the application of IPMA proposals enhances the required knowledge that leads to improved completion and delivery of complex construction projects in risky environments., All authors acknowledge the help received by the research group TEP-955 from the PAIDI (Junta de Andalucia, Spain).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publicación Artículo científico (JournalArticle)

The Relationship between Building Agents in the Context of Integrated Project Management: A Prospective Analysis

  • Cerezo-Narváez, Alberto
  • Pastor-Fernández, Andrés
  • Otero-Mateo, Manuel
  • Ballesteros-Pérez, Pablo|||0000-0002-4629-9664
[EN] The increasing complexity of building projects, with high quality standards, integrated technologies and strong management restrictions, demands the intervention of numerous and diverse specialists. This requires an intense leadership, organization and coordination effort. However, building regulations, such as the Spanish Law on Building Management (LOE) 38/1999, only formally consider developers, project designers, project and work supervisors, quality control entities, construction companies, owners and final users as building agents. However, these categories are insufficient to represent the interests of all the stakeholders. The purpose of this paper is to carry out an analysis of the agents that are currently part of the entire building process. If their relationship of influence and dependence, as well as their alignment with the overall objectives of the project are studied, potential convergences, divergences, agreements and disagreements can be established. To do this, the authors conducted a prospective analysis through the MACTOR (Matrix of Alliances and Conflicts: Tactics, Objectives and Recommendations) strategic planning simulation tool, for which the rules of the Delphi technique were applied and a consultation with technical experts, both professionals and academics, was held. The research provides insight to assess the power relationships between the building agents, as well as to measure the alignment of objectives with their interests. Results show that, in the context of integrated project management (IPM), the influence of technical agents is reduced by limiting their functions to those marked by their regulatory framework, allowing them to focus on their legal powers, and the room for manoeuvre of the professional agents, who are subject to systematized monitoring and control, is also reduced. The prospective analysis also highlights the importance of defining the scope from its early stages, as well as the need to reach multilateral agreements based on the other two main constraints: time and cost., All authors acknowledge the help received by the research group TEP-955 from the PAIDI (Junta de Andalucia, Spain). The first and last authors acknowledge the help received by the research project PIN-0053-2019 by the Fundacion Publica Andaluza Progreso y Salud (Junta de Andalucia, Spain).
RODIN. Repositorio de Objetos de Docencia e Investigación de la Universidad de Cádiz
Publicación Artículo científico (JournalArticle)

Determination of Requirements for the Improvement of Occupational Safety in the Cleaning of Vertical Tanks of Petroleum Products

  • Ramírez Peña, Magdalena
  • Cerezo Narváez, Alberto
  • Pastor Fernández, Andrés
  • Otero Mateo, Manuel
  • Ballesteros Pérez, Pablo
Since the beginning of the second industrial revolution, the use of tanks for the storage of petroleum products ensured the permanent supply of equipment that depended on fossil fuel derived from petroleum, either for direct consumption or as an element for power generation. For correct operation, periodic cleaning of these confined spaces was required, being a common practice for the direct exposure of operators to explosive atmospheres. Currently, there are many industries that keep this kind of deposit, and cleaning works are considered of high occupational risk. In this context, the question arises as to whether human–machine collaboration thanks to the technologies that compose Industry 5.0 can mitigate these risks while generating a sustainable balance by optimizing costs and protecting the environment. In the present work, the analytic hierarchy process (AHP) method is used to prioritize the requirements that should be compiled to establish safe protocols in tank cleaning works, solving the multi-criteria problem. Results prove that a couple of alternatives improve the working conditions of the people involved in this process: the chemical cleaning and the robotic cleaning, which approximately accounts for two thirds of the decision. These requirements are aligned with the Industry 5.0 paradigm, encouraging the use of robots for high-risk processes, and influencing human behavior. In addition, cost reduction is achieved without compromising on quality of service or delivery schedule, thus enabling a circular economy that promotes occupational safety in company policies.
RODIN. Repositorio de Objetos de Docencia e Investigación de la Universidad de Cádiz
Publicación Artículo científico (JournalArticle)

Performance comparison of activity sensitivity metrics in schedule risk analysis

  • Ballesteros Pérez, Pablo
  • Cerezo Narváez, Alberto
  • Otero Mateo, Manuel
  • Pastor Fernández, Andrés
  • Vanhoucke, Mario
In Schedule Risk Analysis (SRA), activity sensitivity metrics measure the importance of activities in a project schedule. Highly sensitive activities are those more likely to increase project duration variability and/or cause project duration extensions. Several activity sensitivity metrics have been proposed over the years, but a comparison of all of them has never been made. This has made it difficult to know which metrics perform better and under what circumstances. In this paper, an extensive comparison of all relevant SRA activity sensitivity metrics is performed using a set of 4100 artificial projects. Unlike previous studies, the comparison framework is decoupled from corrective actions (e.g. activity crashing) which allows the merits of each metric to be assessed individually. Additionally, a new metric that performs better for overall sensitivity ranking is proposed. Results show that most sensitivity metrics do not perform well unless they are applied iteratively (the sensitivity of the remaining scheduled activities has to be recalculated whenever the duration variability of at least one activity has been restricted). However, if applied iteratively, most metrics can enhance project monitoring and control, while significantly shortening project duration.
RODIN. Repositorio de Objetos de Docencia e Investigación de la Universidad de Cádiz
Publicación Artículo científico (JournalArticle)

The Influence of Knowledge on Managing Risk for the Success in Complex Construction Projects: The IPMA Approach

  • Cerezo Narváez, Alberto
  • Pastor Fernández, Andrés
  • Otero Mateo, Manuel
  • Ballesteros Pérez, Pablo
Organizations undertaking construction projects often deal with uncertainty and complexity. Risks include a wide range of occurrences that can lead to project failure. However, these difficulties may be minimized if risks are properly managed. In addition, knowledge management may emerge as a key element in facing unforeseen events and detecting the actions that are working well in other projects. In this context, this study intends to demonstrate the influence of managing organizational knowledge on risk management and the impact of both on the success of projects and associated businesses. To this end, a questionnaire was distributed among construction technicians, practitioners and managers in order to assess the importance of factors managing knowledge and risk and of success criteria. Thanks to the participation of almost four hundred respondents, cause-and-effect relationships are characterized by means of structural equation modeling, statistically confirming them. The specific links between the knowledge-management projects and the skills and abilities to face risks provided by the International Project Management Association (IPMA) standards, with a relation of 0.892 out of 1, justify the 75.1% of the success of the venture. These findings prove that the application of IPMA proposals enhances the required knowledge that leads to improved completion and delivery of complex construction projects in risky environments.