Skip to main content

Resultados relacionados

Resultados totales (Incluyendo duplicados): 24
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Research data Set de datos (Dataset)

Data of a novel MILP model for the production, lot-sizing and scheduling of automotive plastic components on parallel flexible injection machines

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Guzmán Ortiz, Brunnel Eduardo
[EN] The data set contains the input/output data that was entered into the mathematical model to develop the case study. The data is synthetically generated and developed with an algorithm encoded in Python 3.7, the parameters for programming the algorithm are based on real data from a company in the automotive sector and the values have been structured according to the indices defined in the model. Input/output data details have been added to make the model replicable., This work was supported by the Conselleria de Educación, Investigación, Cultura y Deporte - Generalitat Valenciana for hiring predoctoral research staff with Grant (ACIF/2018/170) and European Social Fund with Grant Operational Program of FSE 2014-2020, the Valencian Community, and the authors would like to acknowledge the support of the researchers participating in the collaborative projects ‘Cloud Collaborative Manufacturing Networks’ (C2NET) (http://c2net-project.eu/), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 636909. “Zero Defects Manufacturing Platform” (ZDMP) (www.zdmp.eu) which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 825631
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Master production schedule using robust optimization approaches in an automobile second-tier supplier

  • Martín, Antonio G.
  • Díaz-Madroñero Boluda, Francisco Manuel|||0000-0003-1693-2876
  • Mula, Josefa|||0000-0002-8447-3387
[EN] This paper considers a real-world automobile second-tier supplier that manufactures decorative surface finishings of injected parts provided by several suppliers, and which devises its master production schedule by a manual spreadsheet-based procedure. The imprecise production time in this manufacturer's production process is incorporated into a deterministic mathematical programming model to address this problem by two robust optimization approaches. The proposed model and the corresponding robust solution methodology improve production plans by optimizing the production, inventory and backlogging costs, and demonstrate the their feasibility for a realistic master production schedule problem that outperforms the heuristic decision-making procedure currently being applied in the firm under study., Funding was provided by Horizon 2020 Framework Programme (Grant Agreement No. 636909) in the frame of the "Cloud Collaborative Manufacturing Networks" (C2NET) project.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A Novel MILP Model for the Production, Lot Sizing, and Scheduling of Automotive Plastic Components on Parallel Flexible Injection Machines with Setup Common Operators

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Guzmán-Ortiz, Brunnel Eduardo
[EN] In this article, a mixed integer linear program (MILP) model is proposed for the production, lot sizing, and scheduling of automotive plastic components to minimize the setup, inventory, stockout, and backorder costs, by taking into account injection molds as the main index to schedule on parallel flexible injection machines. The proposed MILP considers the minimum and maximum inventory capacities and penalizes stockout. A relevant characteristic of the modeled problem is the dependence between mold setups to produce plastic components. The lot sizing and scheduling problem solution results in the assignment of molds to machines during a specific time period and in the calculation of the number of components to be produced, which is often called lot size, following a sequence-dependent setup time. Depending on the machine on which the mold is setup, the number of units to be produced will be distinct because machines differ from one another. The stock coverage, defined in demand days, is also included in the MILP to avoid backorders, which is highly penalized in the automotive supply chain. Added to this, the proposed model is extended by considering setup common operators to respond to and fulfill the constraints that appear in automotive plastic enterprises. In this regard, the MILP presented solves a lot-sizing and scheduling problem, emerged in a second-tier supplier of a real automotive supply chain. Finally, this article validates the MILP by performing experiments with different sized instances, including small, medium, and large. The large-sized dataset is characterized by replicating the amount of data used in the real enterprise, which is the object of this study. The goodness of the model is evaluated with the computational time and the deviation of the obtained results as regards to the optimal solution., Thiis work was supported by the Conselleria de Educacion, Investigacion, Cultura y Deporte-Generalitat Valenciana for hiring predoctoral research staff with Grant no. ACIF/2018/170 and European Social Fund with Grant Operational Program of FSE 2014-2020, the Valencian Community, and the authors would like to acknowledge the support of the researchers participating in the collaborative projects 'Cloud Collaborative Manufacturing Networks' (C2NET) (http://c2net-project.eu/), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement no. 63690, and "Zero Defects Manufacturing Platform" (ZDMP) (http://www.zdmp.eu), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement no. 825631.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A MILP for multi-machine injection moulding sequencing in the scope of C2NET Project

  • Andres, B.|||0000-0002-7920-7711
  • Mula, Josefa|||0000-0002-8447-3387
  • Sanchis, Raquel
  • Poler, Raúl
  • Díaz-Madroñedo, Manuel
[EN] The goal of C2NET European H2020 Funded Project is the creation of cloud-enabled tools for supporting the SMEs supply network optimization of manufacturing and logistic assets based on collaborative demand, production and delivery plans. In the scope of C2NET Project, and particularly in the Optimisation module (C2NET OPT), this paper proposes a novel holistic mixed integer linear programing (MILP) model to optimise the injection sequencing in a multi-machine case. The results of the MILP will support the production planner decision-making process in the calculation of (i) moulds setup in certain machines, and (ii) the amount of products to produce in order to minimise the setup, inventory, and backorders costs. The designed MILP takes part of the algorithms repository created in C2NET European Funded Project to solve realistic industry planning problems. The MILP is verified in realistic data considering three data sets with different sizes, in order to test it’s the computation efficiency., European Union's Horizon research and innovation programme
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A data model for collaborative manufacturing environments

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Sanchis, R.|||0000-0002-5495-3339
[EN] This paper addresses the problem of information exchange required for collaborative manufacturing planning processes at supply network levels. For a few years now, the traditional manufacturing planning paradigm has shifted toward optimizing collaborative plans at the inter-enterprise level driven by cloud-enabled tools (manufacturing platforms), from which the need to share data between networked partners arises to solve intra-enterprise plans in real-time scenarios. Collaboration among enterprises has to increasingly deal with the sharing the information encoded in ontologies. Cloud repositories are seen as collaboration mechanisms whose main aim is to exchange data regardless of their origins and nature. In line with this, industrial planning research is encouraged by solving problems regarding information exchange, sharing and storage in cloud collaborative environments. The contribution of this research paper lies in identifying information used by manufacturing enterprises when they follow their planning processes in a cloud collaborative manufacturing context to propose common formalized data terminologies. This paper introduces a novel data model for collaborative manufacturing environments (CMData) by building a taxonomy of data concepts to represent information about the replenishment, production and delivery planning domains. Although there are standards aimed at exchanging product data that covers different parts of the history of a product from conceptual design to disposal, this proposal is defined as a detailed version of such current standard initiatives covering the specific area in the domain of production planning and supply chain collaboration. Moreover, this proposal complements and gives an answer to the new cloud collaborative business needs from industry. The CMData has the following objectives: (i) to solve problems related with data interpretation; (ii) to solve the sharing between enterprise legacy systems and cloud environments through the mapping procedure and (iii) to identify the required data coming from different enterprises to collaboratively compute the joint planning activities. The proposed CMData are validated through their application in the collaborative production scheduling plan of a second-tier supplier and a first-tier supplier in the automotive industry. Future work and open issues are also discussed. (C) 2021 Elsevier B.V. All rights reserved. Keywords, This work has received funding from the European Union's Horizon 2020 research and innovation programme with grant agreements No. 636909 and No. 825631.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Research data Set de datos (Dataset)

A Standardised Data Model for Collaborative Manufacturing CMData

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Sanchis, R.|||0000-0002-5495-3339
Novel standardised data model for collaborative manufacturing environments (CMData), building a taxonomy of data concepts to represent information related to the replenishment, production and delivery planning domains, The authors would like to acknowledge the support of the researchers participating in the collaborative projects “Cloud Collaborative Manufacturing Network” (C2NET) (www.c2net-project.eu) and “Zero Defects Manufacturing Platform” (ZDMP) (www.zdmp.eu).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Towards an Agile and Collaborative Platform for Managing Supply Chain Uncertainties

  • Lauras, Matthieu
  • Lamothe, Jacques
  • Benaben, Frederick
  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
Nowadays, one of the main challenges for Supply Chains is the management of disruptions and uncertainties. Turbulence and instability have now to be considered as the normal situation. Future Supply Chains should be able to cope with this new context to stay competitive. To solve this issue, new approaches and technologies have to be designed in order to improve the agility capability of supply networks. To contribute to this new problem statement, as a part of the H2020 C2NET research project, this paper proposes a concrete research framework. The research aim consists in de!ning precise research orientations in one hand, and structuring a set of technical tasks able to result in an agile and collaborative platform on the other hand. Basically, the main components of the research framework are presented and the expected impactsare discussed.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Storyboard tools for university and education research projects

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
[EN] This paper is focused on the presentation of storyboard and storytelling open source online tools, for its application in the university context and in the education research projects. The main aim of this paper is to provide an open source tool to support (i) university teachers, using storyboard tools as a novel educational resource to include in their master and practice classes, allowing them to structure concepts or explain methodologies through images that have attached short descriptions; (ii) university students, as future industrial engineers, employing storyboard tools for structuring the decision-making process, by taking into account all the actors that are affected in the decision process; (iii) education research projects, adopting storyboard as a tool to aid the creative writing through matching creative images with keywords to capture the essence of the research project., The research leading to these results has received funding from European Community's H2020 Programme (H2020/2014-2020) under grant agreement no 636909, "Cloud Collaborative Manufacturing Networks (C2NET)".
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A Proposal of Standardised Data Model for Cloud Manufacturing Collaborative Networks

  • Andres, B.|||0000-0002-7920-7711
  • Sanchis, R.|||0000-0002-5495-3339
  • Poler, R.|||0000-0003-4475-6371
  • Saari, Leila
[EN] The growing amount of data to be handled by collaborative networks raises the need of introducing innovative solutions to fulfil the lack of affordable tools, especially for Small and Medium-Sized Enterprises, to manage and exchange data. The European H2020 Project Cloud Collaborative Manufacturing Networks develops and offers a structured data model, called Standardised Tables, as an organised framework to jointly work with existing databases to manage big data collected from different industries belonging to the CNs. The information of the Standardised Tables will be mainly used with optimisation and collaboration purposes. The paper describes an application of the Standardised Tables in one of the pilots of the aforementioned project, the automotive industry pilot, for solving the collaborative problem of a Materials Requirement Plan., The research leading to these results is in the frame of the “Cloud Collaborative Manufacturing Networks” (C2NET) project, which has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 636909.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding

  • Mula, Josefa|||0000-0002-8447-3387
  • Díaz-Madroñero Boluda, Francisco Manuel|||0000-0003-1693-2876
  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Sanchis, R.|||0000-0002-5495-3339
[EN] This paper aims to propose a model for solving a capacitated lot-sizing problem with sequence-dependent setups (CLSD) and parallel machines in a bi-part injection moulding (BPIM) context that consists of injecting two different parts or products into the same mould in separate injection cavities. These two parts require the same sequence order and available capacity at the same instant, but generate different part inventories. The addressed problem should be considered a multi-machine CLSD-BPIM one. We provide a mixed integer linear programming (MILP) model for it. The proposed model is based on a real-world case study from a second-tier supplier of the automotive sector. In sequence setup, inventory and resource setup costs terms, the benefits of the proposed multi-machine CLSD-BPIM model are validated by comparing it with a single-machine CLSD-BPIM model that replicates the current planning scenario carried out in the company under study. Additionally, random instances based on the real problem have been generated and tested. The computational results exhibit optimal solutions for the small instances with an average of 0.2-second solution time, the medium instances present average gaps of 0.47% with 2.6 h and large instances present average gaps of 4% with 6 h solution time., The research leading to these results was supported in part by the European Commission under the Grant Agreement No. 825631 `Zero Defects Manufacturing Platform' (ZDMP) (www.zdmp.eu); and the Spanish Ministry of Science, Innovation and Universities project entitled `Optimisation of zero-defects production technologies enabling supply chains 4.0 (CADS4.0)' (RTI2018-101344-B-I00).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Research data Set de datos (Dataset)

Data of a novel MILP model for the production, lot-sizing and scheduling of automotive plastic components on parallel flexible injection machines with setup common operators

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Guzmán Ortiz, Brunnel Eduardo
[EN] The data set contains the input/output data that was entered into the mathematical model to develop the case study. The data is synthetically generated and developed with an algorithm encoded in Python 3.7, the parameters for programming the algorithm are based on real data from a company in the automotive sector and the values have been structured according to the indices defined in the model. Input/output data details have been added to make the model replicable., This work was supported by the Conselleria de Educación, Investigación, Cultura y Deporte - Generalitat Valenciana for hiring predoctoral research staff with Grant (ACIF/2018/170) and European Social Fund with Grant Operational Program of FSE 2014-2020, the Valencian Community, and the authors would like to acknowledge the support of the researchers participating in the collaborative projects ‘Cloud Collaborative Manufacturing Networks’ (C2NET) (http://c2net-project.eu/), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 636909. “Zero Defects Manufacturing Platform” (ZDMP) (www.zdmp.eu) which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 825631
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Responsive Production in Manufacturing: A Modular Architecture

  • Marques, M.
  • Agostinho, Carlos
  • Zacharewicz, G.
  • Jardim-Goncalves, R.
  • Poler, R.|||0000-0003-4475-6371
[EN] This paper proposes an architecture aiming at promoting the convergence of the physical and digital worlds, through CPS and IoT technologies, to accommodate more customized and higher quality products following Industry 4.0 concepts. The architecture combines concepts such as cyber-physical systems, decentralization, modularity and scalability aiming at responsive production. Combining these aspects with virtualization, contextualization, modeling and simulation capabilities it will enable self-adaptation, situational awareness and decentralized decision-making to answer dynamic market demands and support the design and reconfiguration of the manufacturing enterprise., The research leading to these results has received funding from the European Union H2020 project C2 NET (FoF-01-2014) nr 636909.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Methodology to Validate Results from European Research Projects: The C2NET Case Study

  • Sanchis, R.|||0000-0002-5495-3339
  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
[EN] One of the main priorities of the European Commission is the utilisation of European Projects results in further research activities, or in developing, creating and marketing a product or process. For this reason, it is critical to test and validate European projects results before implementing them in real scenarios. In this paper, a general validation methodology addressed to the assessment of technological results has been defined. This general methodology offers the foundations to define specific validation methodologies to validate particular results of different Research Projects. As an example, the general methodology has been applied to define a specific one for the validation of an Optimiser developed within the European Research Project: Cloud Collaborative Manufacturing Networks (C2NET) to guarantee the proper operation of the research results and facilitate their later real implementation and exploitation., The research leading to these results is in the frame of the “Cloud Collaborative Manufacturing Networks” (C2NET) project which has received funding from the European Union’s Horizon 2020research and innovation programme under grant agreement No.63690.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Research software Software (Software)

Synthetic input data generator for a MILP model for lot-sizing and scheduling on parallel flexible injection machines with setup common operators

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Guzmán Ortiz, Brunnel Eduardo
[EN] The Python code generates synthetic input data The dataset contains the input data that for the mathematical model to develop the experiments. Launch LSSP_MILP_BASE_MODEL_GeneratorEXEC for generating synthetic input data by using the CLSD-BPIM Generator. The sizes of the indices (products, parts, resources, periods) for the small, medium and large datasets are the ones used in the experiments., This work was supported by the Conselleria de Educación, Investigación, Cultura y Deporte - Generalitat Valenciana for hiring predoctoral research staff with Grant (ACIF/2018/170) and European Social Fund with Grant Operational Program of FSE 2014-2020, the Valencian Community, and the authors would like to acknowledge the support of the researchers participating in the collaborative projects ‘Cloud Collaborative Manufacturing Networks’ (C2NET) (http://c2net-project.eu/), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 636909. “Zero Defects Manufacturing Platform” (ZDMP) (www.zdmp.eu) which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 825631
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Tools for managing references in class projects and scientific works

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Díaz-Madroñero Boluda, Francisco Manuel|||0000-0003-1693-2876
[EN] This paper presents a set of tools to manage references, for its application in class projects, in the university context, and in scientific works. The main aim of this paper is to provide a set of tools to support university students and researchers to store all their research, and sort all their references, documents and notes in one place. This paper is an extension of the paper Adjustment of students to be future researchers: The importance of a systematic literature review methodology for MSC students [1] that proposes a guideline to help students to systematically perform the literature review phase in the research work. The work developed in the present paper, focuses on collecting, managing and treating the results through building a personalised database, proposing in a more extended way a set of tools to manage references of the research work performed in the systematic literature review., The research leading to these results has received funding from European Community's H2020 Programme (H2020/2014-2020) under grant agreement no 636909, "Cloud Collaborative Manufacturing Networks (C2NET)".
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Capítulo o parte de un libro (BookPart)

Redes Colaborativas de Fabricación en Nube. El proyecto Europeo H2020: C2NET, Cloud Collaborative Manufacturing Networks

  • Sanchis, R.|||0000-0002-5495-3339
  • Poler, R.|||0000-0003-4475-6371
La colaboración, es una tendencia en la gestión de las redes de suministro, que se basa en la planificación, coordinación e integración de procesos de forma conjunta entre todas las entidades de la red. Debido a las características actuales de incertidumbre en los mercados y crisis económica, se precisa de herramientas que fomenten la colaboración para reducir costes e incrementar la confianza y responsabilidad frente a los requerimientos del mercado. El presente estudio muestra las líneas de investigación del proyecto europeo H2020: C2NET, que van dirigidas hacia el desarrollo de un espacio en la Nube con herramientas de optimización y de gestión ágil, con interfaces intuitivas a través de cualquier dispositivo que proporcionan información en tiempo real a toda la red con el fin de mejorar sus procesos decisionales., Elpresente trabajo será parcialmente financiado por la Comunidad Europea en el Programa H2020 (H2020–FoF–01–2014) con el Proyecto "Cloud Collaborative Manufacturing Networks” cuyo número de propuesta es 636909.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Integrated production-distribution planning optimization models: A review in collaborative networks context

  • Andres, B.|||0000-0002-7920-7711
  • Sanchis, R.|||0000-0002-5495-3339
  • Lamothe, Jaques
  • Saari, Leila
  • Hauser, Frederic
[EN] Researchers in the area of collaborative networks are more and more aware of proposing collaborative approaches to address planning processes, due to the advantages associated when enterprises perform integrated planning models. Collaborative production-distribution planning, among the supply network actors, is considered a proper mechanism to support enterprises on dealing with uncertainties and dynamicity associated to the current markets. Enterprises, and especially SMEs, should be able to overcome the continuous changes of the market by increasing their agility. Carrying out collaborative planning allows enterprises to enhance their readiness and agility for facing the market turbulences. However, SMEs have limited access when incorporating optimization tools to deal with collaborative planning, reducing their ability to respond to the competition. The problem to solve is to provide SMEs affordable solutions to support collaborative planning. In this regard, new optimisation algorithms are required in order to improve the collaboration within the supply network partners. As part of the H2020 Cloud Collaborative Manufacturing Networks (C2NET) research project, this paper presents a study on integrated production and distribution plans. The main objective of the research is to identify gaps in current optimization models, proposed to address integrated planning, taking into account the requirements and needs of the industry. Thus, the needs of the companies belonging to the industrial pilots, defined in the C2NET project, are identified; analysing how these needs are covered by the optimization models proposed in the literature, to deal with the integrated production-distribution planning., The research leading to these results is in the frame of the “Cloud Collaborative Manufacturing Networks” (C2NET) project, which has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 636909
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A Holistic Algorithm for Materials Requirement Planning in Collaborative Networks

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Sanchis, R.|||0000-0002-5495-3339
[EN] Collaboration has increasingly been considered a key topic within the small and medium-sized enterprises, allowing dealing with the intense competitiveness of today¿s globalised markets. The European H2020 Cloud Collaborative Manufacturing Networks Project proposes mechanisms to encourage collaboration among enterprises, through the computation of collaborative plans. Particularly, this paper focuses on the proposal of a holistic algorithm to deal with the automated and collaborative calculation of the Materials Requirement Plan. The proposed algorithm is validated in a collaborative network belonging to the automotive industry., The research leading to these results is in the frame of the “Cloud Collaborative Manufacturing Networks” (C2NET) project, which has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 636909.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Optimization Models to Support Decision-Making in Collaborative Networks: A Review

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Saari, Leila
  • Arana, J.
  • Benaches, J.V.
  • Salazar, J.
[EN] Enterprises, especially SMEs, are increasingly aware of belonging to Collaborative Networks (CN), due to the competitive advantages associated to deal with markets globalization and turbulence. The participation in CN involves enterprises to perform collaborative planning along all the processes established with the CN partners. Nevertheless, the access of SMEs to optimisation tools, for dealing with collaborative planning, is currently limited. To solve this concern, novel optimisation approaches have to be designed in order to improve the inte- grated planning in CN. In order to deal with this problem, this paper proposes a baseline to identify current enterprise needs and literature solutions in the replenishment, production and delivery collaborative planning, as a part of the H2020 Cloud Collaborative Manufacturing Networks (C2NET) research project. The main gaps found between the literature reviewed and the enterprises¿ needs are presented and discussed., The research leading to these results is in the frame of the “Cloud Collaborative Manufacturing Networks” (C2NET) project, which has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 636,909.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Decentralised replenishment-production planning optimisation using negotiation rules in a collaborative network

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Mula, Josefa|||0000-0002-8447-3387
  • Díaz-Madroñero Boluda, Francisco Manuel|||0000-0003-1693-2876
  • Sanchis, R.|||0000-0002-5495-3339
[EN] This paper proposes a decentralised planning optimisation approach by using mathematical programming and negotiation mechanisms in a collaborative network. Two partners addressing the replenishment and production stages are considered. Concretely, production scheduling plans and material requirement plans, modelled by two mixed-integer programming models, are modified according to the established negotiation rules between the two collaborative partners. The main contribution of this paper is the improvement of the replenishment and production plans upstream of the network; proposing a decentralised collaborative planning process. The validation of the proposal is done using data based on an automotive industry., “The research leading to these results is in the frame of the “Cloud Collaborative Manufacturing Networks” (C2NET) project which has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 636909
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Research software Software (Software)

Synthetic input data generator for a MILP model for lot-sizing and scheduling on parallel flexible injection machines

  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Guzmán Ortiz, Brunnel Eduardo
[EN] The Python code generates synthetic input data. The dataset contains the input data that for the mathematical model to develop the experiments. Launch LSSP_MILP_BASE_MODEL_GeneratorEXEC for generating synthetic input data by using the CLSD-BPIM Generator. The sizes of the indices (products, parts, resources, periods) for the small, medium and large datasets are the ones used in the experiments., This work was supported by the Conselleria de Educación, Investigación, Cultura y Deporte-Generalitat Valenciana for hiring predoctoral research staff with Grant no. ACIF/2018/170 and European Social Fund with Grant Operational Program of FSE 2014-2020, the Valencian Community, and the authors would like to acknowledge the support of the researchers participating in the collaborative projects ‘Cloud Collaborative Manufacturing Networks’ (C2NET) (http://c2net-project.eu/), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement no. 636909, and “Zero Defects Manufacturing Platform” (ZDMP) (http://www.zdmp.eu), which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement no. 825631.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Towards a sustainable interoperability in networked enterprise information systems: Trends of knowledge and model-driven technology

  • Agostinho, Carlos
  • Ducq, Y.
  • Zacharewicz, G.
  • Sarraipa, J.
  • Lampathaki, F.
  • Jardim-Goncalves, R.
  • Poler, R.|||0000-0003-4475-6371
[EN] In a turbulent world, global competition and the uncertainty of markets have led organizations and technology to evolve exponentially, surpassing the most imaginary scenarios predicted at the beginning of the digital manufacturing era, in the 1980s. Business paradigms have changed from a standalone vision into complex and collaborative ecosystems where enterprises break down organizational barriers to improve synergies with others and become more competitive. In this context, paired with networking and enterprise integration, enterprise information systems (EIS) interoperability gained utmost importance, ensuring an increasing productivity and efficiency thanks to a promise of more automated information exchange in networked enterprises scenarios. However, EIS are also becoming more dynamic. Interfaces that are valid today are outdated tomorrow, thus static interoperability enablers and communication software services are no longer the solution for the future. This paper is focused on the challenge of sustaining networked EIS interoperability, and takes up input from solid research initiatives in the areas of knowledge management and model driven development, to propose and discuss several research strategies and technological trends towards next EIS generation., Authors would like to acknowledge the European Commission and support received through the 7th Framework Programme and H2020 funded R&D projects MSEE (FP7 284860), OSMOSE (FP7 610905) and C2NET (H2020 636909) that supported the development of various ideas, concepts and use case presented.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

The C2NET Optimisation Solution

  • Sanchis, R.|||0000-0002-5495-3339
  • Andres, B.|||0000-0002-7920-7711
  • Poler, R.|||0000-0003-4475-6371
  • Mula, Josefa|||0000-0002-8447-3387
  • Díaz-Madroñero Boluda, Francisco Manuel|||0000-0003-1693-2876
[EN] Today's lack of competitiveness of European enterprises has led to the Cloud Collaborative Manufacturing Networks (C2NET) European funded project to develop an optimisation solution to provide enterprises, particularly small-and medium sized ones (SMEs), affordable and easy-to-use means to optimise their planning activities to improve their efficiency and competitiveness. This paper focuses on the C2NET optimisation solu-tion, constituted mainly by C2NET Optimiser module components: (i) optimisation algorithms; (ii) the solver manager; (iii) the optimisation problem configurator; (iv) processes of the optimisation of manufacturing assets manager. To perform optimisation, it is necessary to provide the previous components with the needed input data, which can be done within the data collection framework module by defining a standardised data model (STables). Another data model is defined to show optimisation results to SMEs, namely the plan data model (PTables). The C2NET Optimisation Solution supports manufacturing networks, especially those composed of SMEs, and is based on the optimisation of manufacturing and logistics assets by the single and/or collaborative computation of production, replenishment and delivery plans., The research that led to these results forms part of the "Cloud Collaborative Manufacturing Networks" (C2NET) Project, which has received funding from the EU Horizon 2020 Research and Innovation Programme with grant agreement No. 63690.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

A Cloud Platform to support Collaboration in Supply Networks

  • Andres, B.|||0000-0002-7920-7711
  • Sanchis, Raquel
  • Poler, Raul
[EN] Collaboration is a trend in supply networks management, based on the jointly planning, coordination and integration of processes, participating all network entities. Due to the current characteristics of uncertainty in the markets and economic crisis, there is a need to encourage collaboration tools to reduce costs and increase trust and accountability to market requirements. This study presents an overview of the research carried out in the H2020 European Project: Cloud Collaborative Manufacturing Networks (C2NET), which is directed towards the development a cloud platform that consist of, optimization tools, collaboration tools to support and agile management of the network. The collaborative cloud platform allows to collect real time information coming from real-world resources and considering all the actors involved in the process. The collaborative cloud provides real time data gathered from the entire network partners in order to improve their decision-making processes., The research leading to these results has received funding from European Community’s H2020 Programme (H2020/2014-2020) under grant agreement n°636909, “Cloud Collaborative Manufacturing Networks (C2NET)”.