Skip to main content

INTEGRATED SPATIAL PLANNING ACROSS REALMS FOR BIODIVERSITY AND HUMAN DEVELOPMENT IN A CONTEXT OF CHANGE

PCI2022-135080-2

•
Funding agency name Agencia Estatal de Investigación
Funding agency acronym AEI
Program Programa Estatal para Afrontar las Prioridades de Nuestro Entorno
Subprogram Subprograma Estatal de Internacionalización
Call Proyectos Programación Conjunta Internacional
Call year 2022
State Plan 2021-2023 Plan Estatal de Investigación Científica y Técnica y de Innovación
Beneficiary centre UNIVERSIDAD DE SEVILLA

Resultados relacionados

Resultados totales (Incluyendo duplicados): 7
Encontrada(s) 1 página(s)

Docta Complutense
Publication Artículo científico (JournalArticle)

Identifying River Corridors for the Implementation of the Network of Green Infrastructure in Spain

  • Hermoso, V.
  • Salgado Rojas, J.
  • Lanzas, M.
  • Morcillo Alonso, Felipe
  • Casals, F.
  • Oñorbe, M.
  • Hidalgo, R.
  • Magdaleno, G.
  • Sánchez González, J. R.
1. Spatial–temporal connectivity plays a key role in freshwater ecosystems by maintaining processes such as the transfer of materials and energy, gene exchange, and migratory movements necessary for the maintenance of functional ecosystems. However, connectivity in these systems has undergone severe modifications over the last century, threatening the persistence of biodiversity and the ecosystem services they provide. The European Union (EU) acknowledges the value of freshwater ecosystems as important connectivity elements of the landscape and the need to recover their functionality, not only for freshwater biodiversity, in policy instruments such as the European Biodiversity Strategy for 2030 or the Green Infrastructure Strategy. Priority areas need to be designated and managed as corridors. However, given the widespread impacts to connectivity, balancing the functionality of corridors and socio-economic constraints will be key. 2. We demonstrate how to design a network of river corridors in Spain to connect populations of freshwater fish species, while minimising the impact of barriers that compromise the functionality of the corridor or make its restoration expensive. We integrated information on the spatial distribution of 40 fish species and more than 30.000 barriers along 80.000 km of rivers and streams to identify priority corridors that connect at least 50% of the populations for all species. We ran three different scenarios that depict alternative planning interests and constraints: (i) an unconstrained scenario, where all river reaches were equally available to be part of the corridor; (ii) a Natura 2000 scenario (N2K), where corridors connected protected areas; and (iii) a no dam allowed scenario (NDA), where we avoided selecting reaches with dams as part of the network of corridors. We measured four different indicators to compare scenarios: number of planning units selected, the number of dams included, the length of continuous units selected and the length of continuous units selected for each species individually. 3. We found that the optimal network of corridors always contained reaches with barriers. However, the network was more spatially continuous (22% and 26% more continuity) and was always less impacted by barriers (6.9 and 2.6 fewer barriers) under the unconstrained scenario than under the N2K and NDA scenarios. The network of corridors was free from dams only under the NDA scenario, although the average connectivity across all species was always lower than under the other two scenarios. 4. Our results demonstrate that the design and management of a coherent network of freshwater corridors in Spain will need to integrate reaches impacted by barriers. Securing the functionality of such a network by restoring the lost connectivity will pose a socio-economic challenge. Spatial planning can help address this challenge by identifying priority corridors that minimise restoration efforts. 5. The approach demonstrated here could be extended to other components of connectivity, such as lateral and vertical connectivity, as well as biodiversity and ecosystem services features to address other dimensions and functionality of freshwater corridors. However, implicit decisions that contextualise the planning exercise, exemplified by the differences across the three alternative scenarios we tested, lead to very different spatial priorities. Therefore, defining the planning objectives and constraints to deliver solutions that fit for purpose is critical.
Repositori Obert UdL
Publication Artículo científico (JournalArticle)

Identifying river corridors for the implementation of the network of green infrastructure in Spain

  • Hermoso, V.
  • Salgado-Rojas J.
  • Lanzas M.
  • Morcillo, F.
  • Casals, F.
  • Oñorbe, M.
  • Hidalgo, R.
  • Magdaleno, G.
  • Sánchez-González, Jorge R.
Spatial–temporal connectivity plays a key role in freshwater ecosystems by maintaining processes such as the transfer of materials and energy, gene exchange, and migratory movements necessary for the maintenance of functional ecosystems. However, connectivity in these systems has undergone severe modifications over the last century, threatening the persistence of biodiversity and the ecosystem services they provide. The European Union (EU) acknowledges the value of freshwater ecosystems as important connectivity elements of the landscape and the need to recover their functionality, not only for freshwater biodiversity, in policy instruments such as the European Biodiversity Strategy for 2030 or the Green Infrastructure Strategy. Priority areas need to be designated and managed as corridors. However, given the widespread impacts to connectivity, balancing the functionality of corridors and socio-economic constraints will be key. 2. We demonstrate how to design a network of river corridors in Spain to connect populations of freshwater fish species, while minimising the impact of barriers that compromise the functionality of the corridor or make its restoration expensive. We integrated information on the spatial distribution of 40 fish species and more than 30.000 barriers along 80.000 km of rivers and streams to identify priority corridors that connect at least 50% of the populations for all species. We ran three different scenarios that depict alternative planning interests and constraints: (i) an unconstrained scenario, where all river reaches were equally available to be part of the corridor; (ii) a Natura 2000 scenario (N2K), where corridors connected protected areas; and (iii) a no dam allowed scenario (NDA), where we avoided selecting reaches with dams as part of the network of corridors. We measured four different indicators to compare scenarios: number of planning units selected, the number of dams included, the length of continuous units selected and the length of continuous units selected for each species individually. 3. We found that the optimal network of corridors always contained reaches with barriers. However, the network was more spatially continuous (22% and 26% more continuity) and was always less impacted by barriers (6.9 and 2.6 fewer barriers) under the unconstrained scenario than under the N2K and NDA scenarios. The network of corridors was free from dams only under the NDA scenario, although the average connectivity across all species was always lower than under the other two scenarios. 4. Our results demonstrate that the design and management of a coherent network of freshwater corridors in Spain will need to integrate reaches impacted by barriers. Securing the functionality of such a network by restoring the lost connectivity will pose a socio-economic challenge. Spatial planning can help address this challenge by identifying priority corridors that minimise restoration efforts. 5. The approach demonstrated here could be extended to other components of connectivity, such as lateral and vertical connectivity, as well as biodiversity and ecosystem services features to address other dimensions and functionality of freshwater corridors. However, implicit decisions that contextualise the planning exercise, exemplified by the differences across the three alternative scenarios we tested, lead to very different spatial priorities. Therefore, defining the planning objectives and constraints to deliver solutions that fit for purpose is critical., Funding: This work was supported by Ministerio para la Transici\u00F3n Ecol\u00F3gica y el Reto Demogr\u00E1fico. This study was funded by the Spanish Ministry for Ecological Transition and Demographic Challenge (MITERD) through the project \u2018Propuesta metodol\u00F3gica pr\u00E1ctica para abordar el c\u00E1lculo y representaci\u00F3n cartogr\u00E1fica de la conectividad ecol\u00F3gica de ecosistemas fluviales\u2019. The study also received support from the Biodiversa+, the European Biodiversity Partnership, in the context of the INSPIRE project under the 2021\u20132022 BiodivProtect joint call. It was co-funded by the European Commission (GA No. 101052342) and the following funding organisations: Agencia Estatal de Investigaci\u00F3n (PCI2022-135080-2). J.S.-R. was funded by the Chilean National Agency of Research and Development (FONDECYT N.1220830), and he also received funding from the European Union's Horizon 2020 research and innovation programme under the Marie Sk\u0142odowska Curie grant agreement No. 101007950
DIGITAL.CSIC. Repositorio Institucional del CSIC
Publication Artículo científico (JournalArticle)

Integrating multiple landscape management strategies to optimise conservation under climate and planning scenarios: a case study in the Iberian Peninsula

  • Cánibe, Miguel
  • Hermoso, Virgilio
  • Azevedo, João C.
  • Campos, João C.
  • Salgado Rojas, José
  • Sil, Â.
  • Regos-Sanz, Adrián
15 pages, 10 figures, 2 tables, Global change demands dynamic landscape management that integrates different strategies (e.g. promoting rewilding or traditional farming practices) to address the impact of climate and land use change. Planning for management strategies individually can lead to severe trade-offs between objectives, high opportunity costs and challenging implementation. Integrated management plans are needed to optimise the combination of multiple management strategies. We used the multi-action planning tool ‘Prioriactions’ to prioritise the spatial allocation of four management strategies (Afforestation, Rewilding, Farmland Return and Agroforestry Return) in the Meseta Ibérica transboundary Biosphere Reserve. We aimed to achieve targets for conservation of species suitable area and ecosystem services supply while minimising fire hazard under different climate scenarios. We tested this approach under contrasting planning scenarios depicting different management priorities (Equally Weighted, Forest Maximising and Open Maximising). By integrating multiple management strategies, we could achieve management goals for biodiversity and ecosystem services under different planning scenarios, minimising trade-offs and deriving recommendations easier to uptake. The spatial allocation and extent of management strategies varied according to climate change and planning scenarios. Afforestation was needed when putting more priority on forest species and carbon sequestration, while more Farmland Return was allocated when preserving open habitat species and agriculture. Fire hazard was higher in Rewilding areas and lower in Farmland Return and Agroforestry Return areas. The novelty of our approach lies in its capacity to combine different management strategies and provide an optimised spatial arrangement based on management features, making it suitable for planning in dynamic and complex environments where multiple pressures and objectives must be considered., This work was supported grant PCI2022-135080-2 funded by AEI and the European Union NextGenerationEU, portuguese national funds through FCT/MCTES (PIDDAC): CIMO, UIDB/00690/2020 (https://doi.org/10.54499/UIDB/00690/2020) and UIDP/00690/2020 (https://doi.org/10.54499/UIDP/00690/2020); and SusTEC, LA/P/0007/2020 (https://doi.org/10.54499/LA/P/0007/2020). AR was supported by the ‘Juan de la Cierva’ and ‘Ramón y Cajal’ fellowship programs of the Spanish Ministry of Science and Innovation (IJC2019-041033-I and RYC2022-036822-I). ÂS received support from the Portuguese Foundation for Science and Technology (FCT) through Ph.D. Grant SFRH/BD/132838/2017, funded by the Ministry of Science, Technology and Higher Education, and by the European Social Fund — Operational Program Human Capital within the 2014–2020 EU Strategic Framework; and the European Union’s Horizon Europe research and innovation programme under Grant Agreement No 101060415, for the project “SELINA — Science for evidence-based and sustainable decisions about natural capital”. BIOPOLIS receives institutional funding from the European Union’s Horizon 2020 Research and Innovation Programme under the Grant Agreement Number 857251. Most spatial input data was created during the “FireSmart” project (PCIF/MOG/0083/2017)., Peer reviewed
DIGITAL.CSIC. Repositorio Institucional del CSIC
Publication Artículo científico (JournalArticle)

Identifying River Corridors for the Implementation of the Network of Green Infrastructure in Spain

  • Hermoso, Virgilio
  • Salgado Rojas, José
  • Lanzas, M.
  • Morcillo Alonso, Felipe
  • Casals, Frederic
  • Oñorbe, M.
  • Hidalgo, R.
  • Magdaleno, G.
  • Sánchez-González, Jorge R.
1. Spatial–temporal connectivity plays a key role in freshwater ecosystems by maintaining processes such as the transfer of materials and energy, gene exchange, and migratory movements necessary for the maintenance of functional ecosystems. However, connectivity in these systems has undergone severe modifications over the last century, threatening the persistence of biodiversity and the ecosystem services they provide. The European Union (EU) acknowledges the value of freshwater ecosystems as important connectivity elements of the landscape and the need to recover their functionality, not only for freshwater biodiversity, in policy instruments such as the European Biodiversity Strategy for 2030 or the Green Infrastructure Strategy. Priority areas need to be designated and managed as corridors. However, given the widespread impacts to connectivity, balancing the functionality of corridors and socio-economic constraints will be key. 2. We demonstrate how to design a network of river corridors in Spain to connect populations of freshwater fish species, while minimising the impact of barriers that compromise the functionality of the corridor or make its restoration expensive. We integrated information on the spatial distribution of 40 fish species and more than 30.000 barriers along 80.000 km of rivers and streams to identify priority corridors that connect at least 50% of the populations for all species. We ran three different scenarios that depict alternative planning interests and constraints: (i) an unconstrained scenario, where all river reaches were equally available to be part of the corridor; (ii) a Natura 2000 scenario (N2K), where corridors connected protected areas; and (iii) a no dam allowed scenario (NDA), where we avoided selecting reaches with dams as part of the network of corridors. We measured four different indicators to compare scenarios: number of planning units selected, the number of dams included, the length of continuous units selected and the length of continuous units selected for each species individually. 3. We found that the optimal network of corridors always contained reaches with barriers. However, the network was more spatially continuous (22% and 26% more continuity) and was always less impacted by barriers (6.9 and 2.6 fewer barriers) under the unconstrained scenario than under the N2K and NDA scenarios. The network of corridors was free from dams only under the NDA scenario, although the average connectivity across all species was always lower than under the other two scenarios. 4. Our results demonstrate that the design and management of a coherent network of freshwater corridors in Spain will need to integrate reaches impacted by barriers. Securing the functionality of such a network by restoring the lost connectivity will pose a socio-economic challenge. Spatial planning can help address this challenge by identifying priority corridors that minimise restoration efforts. 5. The approach demonstrated here could be extended to other components of connectivity, such as lateral and vertical connectivity, as well as biodiversity and ecosystem services features to address other dimensions and functionality of freshwater corridors. However, implicit decisions that contextualise the planning exercise, exemplified by the differences across the three alternative scenarios we tested, lead to very different spatial priorities. Therefore, defining the planning objectives and constraints to deliver solutions that fit for purpose is critical., This study was funded by the Spanish Ministry for Ecological Transition and Demographic Challenge (MITERD) through the project ‘Propuesta metodológica práctica para abordar el cálculo y representación cartográfica de la conectividad ecológica de ecosistemas fluviales’. The study also received support from the Biodiversa+, the European Biodiversity Partnership, in the context of the INSPIRE project under the 2021–2022 BiodivProtect joint call. It was co-funded by the European Commission (GA No. 101052342) and the following funding organisations: Agencia Estatal de Investigación (PCI2022-135080-2). J.S.-R. was funded by the Chilean National Agency of Research and Development (FONDECYT N.1220830), and he also received funding from the European Union's Horizon 2020 research and innovation programme under the Marie Skłodowska Curie grant agreement No. 101007950., Peer reviewed
DIGITAL.CSIC. Repositorio Institucional del CSIC
Publication Artículo científico (JournalArticle)

Restoring free-flowing rivers: Planning for longitudinal and lateral connectivity recovery

  • Hermoso, Virgilio
Spatial–temporal connectivity is a key feature defining functional freshwater ecosystems but has been deeply transformed worldwide by longitudinal barriers, like dams, weirs or culverts and lateral barriers such as levees or channels, which have interrupted longitudinal continuity and disconnected rivers from their floodplains, respectively. There is growing interest in restoring the natural functionality of rivers and streams recovering free-flowing rivers, as these infrastructures threaten the maintenance of ecological processes that sustain biodiversity and ecosystem services. This recovery must be supported by adequate planning, often in entire catchments, to overcome the limitations of traditional opportunistic decisions, which have dragged the effectiveness of past river restoration. Most of the restoration planning efforts have focused on longitudinal connectivity. However, the recovery of free-flowing rivers demands that future restoration efforts also consider other dimensions of connectivity. I demonstrate how to plan for the recovery of longitudinal and lateral connectivity by identifying priority longitudinal and lateral barriers for restoration, to recover connectivity between populations of freshwater fish and floodplain habitats, while minimising the opportunity cost of restoration efforts. I test the approach under four alternative scenarios, including a coordinated vs. an uncoordinated scenario, where both types of barriers are simultaneously or individually prioritised. I also explored a null cost scenario where all barriers had the same opportunity cost, and a locked out scenario where barriers with a high opportunity cost were not allowed for selection, both under coordinated conditions. The results show that coordinated planning taking into account the opportunity costs of barriers leads to recommendations with the best perspective for the ecological recovery of free-flowing rivers, with lateral barriers selected in combination with longitudinal barriers upstream to allow recovery of the functionality of floodplains reconnected to rivers, while minimising the opportunity cost of restoration. Synthesis and Applications. Adequate planning should guide decision making in complex scenarios like river restoration, where opportunistic approaches have proven ineffective. This includes setting clear objectives and constraints and using adequate data. Restoring free-flowing rivers will also need the restoration of more than longitudinal connectivity, which will benefit from integrated planning of multiple types of barriers simultaneously., This research was funded by Biodiversa+, the European Biodiversity Partnership, in the context of the INSPIRE project under the 2021-2022 BiodivProtect joint call. It was co-funded by the European Commission (GA No. 101052342) and the Spanish Agencia Estatal de Investigación (PCI2022-135080-2)., Peer reviewed
DIGITAL.CSIC. Repositorio Institucional del CSIC
Publication Artículo científico (JournalArticle)

Optimising management against dynamic threats: A spatially explicit approach based on integer programming

  • Salgado Rojas, José
  • Hermoso, Virgilio
  • Álvarez Miranda, Eduardo
Defining strategies to control dynamic threats is a highly complex problem that is defined by the biological characteristics of the threatening agents (e.g. invasive species), the landscape context and the management objective within the constraints of limited financial resources. While different optimisation models have focussed on finding frameworks capable of incorporating complex dynamics between species and threats, they often overlook the spatial aspect of management plans or address it at a very coarse resolution. Here, we develop a framework based on a Mixed Integer Programming (MIP) methodology to design multi-period management planning strategies that account for the dynamic nature of threats and abatement actions. The model is capable of dealing with different types of threats, depending on their nature and propagation rate. The allocation of management actions in space and time is prioritised to maximise the area where all species are free from threats at the end of the planning period. Employing a Warm-start algorithmic strategy ensures rapid generation of feasible solutions, enhancing the model's practical applicability and scalability. To demonstrate the effectiveness of our methodology, we apply it to two case studies. The first case simulates a threat's appearance and radial spread within a 10 × 10 grid, where two species are spatially distributed. The second case focusses on a portion of the Mitchell River catchment in northern Australia, where 31 freshwater fish species are affected by one simulated threat, using a wide range of management budgets. The results demonstrate how the methodology allows giving a guide on the best use of the resources considering trade-offs among the ecological, spatial and cost criteria, enabling decision-makers to explore and analyse a broad range of conservation strategies and to select the one exhibiting the best quantitative and qualitative strategic and operational outcomes. Our model and resolution approach enable decision-makers to explore and analyse a broad range of strategies to concurrently halt, eliminate or contain the propagation of multiple threats. The ability to optimally deal with large-scale, realistic scenarios makes our approach an important contribution to the field of invasive species control., The study received support from Biodiversa+, the European Biodiversity Partnership, in the context of the INSPIRE project under the 2021–2022 BiodivProtect joint call. It was co-funded by the European Commission (GA No. 101052342) and the Spanish Agencia Estatal de Investigación (PCI2022-135080-2). It furthermore received funding from the European Union’s H2020 research and innovation programmes under the Marie Sklodowska-Curie grant agreement no. 101007950 (DecisionES). J.S.-R. was funded by the Spanish Ministry of Science, Innovation and Universities through a Juan de la Cierva-Incorporación fellowship (JDC2023-051915-I) and Forest Landscape Planning and Decision Making: towards resilient landscapes (ForPLADEM)” research group, GRC (2021 SGR 01544). E.Á.-M. was supported by the Chilean National Agency of Research and Development (ANID) through the grant FONDECYT N.1220830, through the Complex Engineering Systems Institute, Chile (ANID/PIA AFB230002), and through the Institute of Ecology and Biodiversity, Chile (ANID/BASAL FB210006)., Peer reviewed
Recercat. Dipósit de la Recerca de Catalunya
Publication Artículo científico (JournalArticle)

Identifying river corridors for the implementation of the network of green infrastructure in Spain

  • Hermoso, V.
  • Salgado-Rojas J.
  • Lanzas M.
  • Morcillo, F.
  • Casals, F.
  • Oñorbe, M.
  • Hidalgo, R.
  • Magdaleno, G.
  • Sánchez-González, Jorge R.
Spatial–temporal connectivity plays a key role in freshwater ecosystems by maintaining processes such as the transfer of materials and energy, gene exchange, and migratory movements necessary for the maintenance of functional ecosystems. However, connectivity in these systems has undergone severe modifications over the last century, threatening the persistence of biodiversity and the ecosystem services they provide. The European Union (EU) acknowledges the value of freshwater ecosystems as important connectivity elements of the landscape and the need to recover their functionality, not only for freshwater biodiversity, in policy instruments such as the European Biodiversity Strategy for 2030 or the Green Infrastructure Strategy. Priority areas need to be designated and managed as corridors. However, given the widespread impacts to connectivity, balancing the functionality of corridors and socio-economic constraints will be key. 2. We demonstrate how to design a network of river corridors in Spain to connect populations of freshwater fish species, while minimising the impact of barriers that compromise the functionality of the corridor or make its restoration expensive. We integrated information on the spatial distribution of 40 fish species and more than 30.000 barriers along 80.000 km of rivers and streams to identify priority corridors that connect at least 50% of the populations for all species. We ran three different scenarios that depict alternative planning interests and constraints: (i) an unconstrained scenario, where all river reaches were equally available to be part of the corridor; (ii) a Natura 2000 scenario (N2K), where corridors connected protected areas; and (iii) a no dam allowed scenario (NDA), where we avoided selecting reaches with dams as part of the network of corridors. We measured four different indicators to compare scenarios: number of planning units selected, the number of dams included, the length of continuous units selected and the length of continuous units selected for each species individually. 3. We found that the optimal network of corridors always contained reaches with barriers. However, the network was more spatially continuous (22% and 26% more continuity) and was always less impacted by barriers (6.9 and 2.6 fewer barriers) under the unconstrained scenario than under the N2K and NDA scenarios. The network of corridors was free from dams only under the NDA scenario, although the average connectivity across all species was always lower than under the other two scenarios. 4. Our results demonstrate that the design and management of a coherent network of freshwater corridors in Spain will need to integrate reaches impacted by barriers. Securing the functionality of such a network by restoring the lost connectivity will pose a socio-economic challenge. Spatial planning can help address this challenge by identifying priority corridors that minimise restoration efforts. 5. The approach demonstrated here could be extended to other components of connectivity, such as lateral and vertical connectivity, as well as biodiversity and ecosystem services features to address other dimensions and functionality of freshwater corridors. However, implicit decisions that contextualise the planning exercise, exemplified by the differences across the three alternative scenarios we tested, lead to very different spatial priorities. Therefore, defining the planning objectives and constraints to deliver solutions that fit for purpose is critical., Funding: This work was supported by Ministerio para la Transici\u00F3n Ecol\u00F3gica y el Reto Demogr\u00E1fico. This study was funded by the Spanish Ministry for Ecological Transition and Demographic Challenge (MITERD) through the project \u2018Propuesta metodol\u00F3gica pr\u00E1ctica para abordar el c\u00E1lculo y representaci\u00F3n cartogr\u00E1fica de la conectividad ecol\u00F3gica de ecosistemas fluviales\u2019. The study also received support from the Biodiversa+, the European Biodiversity Partnership, in the context of the INSPIRE project under the 2021\u20132022 BiodivProtect joint call. It was co-funded by the European Commission (GA No. 101052342) and the following funding organisations: Agencia Estatal de Investigaci\u00F3n (PCI2022-135080-2). J.S.-R. was funded by the Chilean National Agency of Research and Development (FONDECYT N.1220830), and he also received funding from the European Union's Horizon 2020 research and innovation programme under the Marie Sk\u0142odowska Curie grant agreement No. 101007950