Skip to main content

Resultados relacionados

Resultados totales (Incluyendo duplicados): 6
Encontrada(s) 1 página(s)

RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Comparing Team Interactions in Traditional and BIM-Lean Design Management

  • Herrera, Rodrigo F.
  • Mourgues, Claudio
  • Alarcón, Luis F.
  • Pellicer, Eugenio|||0000-0001-9100-0644
[EN] There is qualitative evidence showing that design teams that use BIM-lean management have a higher level of interaction than design teams that do not use this management approach. However, there is no quantitative empirical evidence of this higher level of interaction. Therefore, the objective of this paper is to present quantitative empirical evidence of the differences among the various types of interactions of a design team. Two case studies were analyzed, and their design management was assessed from a lean BIM perspective while their team interactions were assessed using social network analysis (SNA). To achieve the aim of this paper, four steps were performed: (1) case study selection; (2) description of the design management of the projects from the lean design management and BIM perspectives; (3) assessment of design team interaction; and (4) comparison using SNA. The results show that the project that applied BIM-lean management exhibited higher levels of interactions among its design team members than the traditional team; transparent, orderly, and standardized information flows; a collaborative, trusting, and learning environment; and commitment management. None of these interaction elements were visible in the project that did not apply BIM-lean management. It is suggested that an analysis be performed on a representative sample of projects in the future so that conclusive statistical inferences could be made., This research was funded by Fondecyt Regular, grant number 1210769 and ANID, grant number CONICYT-PCHA/National Doctorate/2018-21180884. The APC was paid by the Pontificia Universidad Católica de Valparaíso.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

An Assessment of Lean Design Management Practices in Construction Projects

  • Herrera, Rodrigo F.
  • Mourgues, Claudio
  • Alarcon, Luis F.
  • Pellicer, Eugenio|||0000-0001-9100-0644
[EN] Evidence exists for the application of lean management practices in the design process. However, there is no systematic review of this type of practice that links the design management practices to the lean construction principles. There is no tool to assess the level of use of lean design management practices in construction projects either. Therefore, this paper aims to assess the lean management practices that are performed at the design phase of construction projects. The research was divided into a literature review of design management practices; a validation of lean design management practices with a practice¿principle relationship, based on an expert survey; the devolvement of a tool (questionnaire) to evaluate the lean design management practices; and an assessment in 64 construction projects (coherence, reliability, correlation, and descriptive analysis). It is concluded that evidence exists for the implementation of 19 lean design management practices. These practices are grouped into three categories: stakeholder management, planning and control, and problem solving and decision making. Additionally, in the assessment of the 64 projects, it can be observed that the lean design management practices are at initial levels of implementations, so there is a significant development gap. This research proposes a tool to assess management practices in the design phase of construction projects; then, the study identifies implementations gaps, it provides benchmarks with other projects, and it improves the design process through a taxonomy of lean design management practices., This research was funded by CONICYT grant number PCHA/National Doctorate/2018-21180884 for funding the graduate research of Herrera, and the financial support by FONDECYT (1181648).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Impact of game-based learning on understanding Lean Construction Principles

  • Herrera, Rodrigo F.
  • Sanz-Benlloch, Amalia|||0000-0001-8051-0649
  • Montalbán-Domingo, Laura|||0000-0002-9506-0350
  • García-Segura, Tatiana|||0000-0002-7059-0566
  • Pellicer, Eugenio|||0000-0001-9100-0644
[EN] Lean philosophy introduces a new approach for maximizing value while minimizing waste, facilitating sustainable practices at the same time. Companies have become aware of these improvements and are demanding students well formed in Lean concepts. However, to meet this demand, universities must adapt their curricula to include courses that use alternative teaching methods to connect to real contexts. This paper seeks to analyze the benefits of lecture- and game-based learning for developing students¿ understanding of Lean Construction Principles. A case study is carried out in the ¿Lean Construction¿ course of the Master of Planning and Management in Civil Engineering of the Universitat Politècnica de València. A combination of a traditional lecture and three simple games is applied. Descriptive statistics, the Mann¿Whitney U-test, and the Wilcoxon test are performed to analyze the impact of each activity on the understanding of each Lean Construction Principle. Results highlight the importance of combining the lecture class with multiple games to effectively impart knowledge about Lean principles and their application in the construction industry. In addition, they emphasize the importance of selecting the game according to the Lean principle to be taught., This research was funded by CONICYT grant number PCHA/National Doctorate/2018-21180884 for funding the graduate research of Herrera, and by the Spanish Ministry of Economy and Competitiveness, along with FEDER funding, grant number BIA2017-85098-R. The APC was funded by School of Civil Engineering, Pontificia Universidad Catolica de Valparaiso, Chile.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects

  • Herrera, Rodrigo F.
  • Mourgues, Claudio
  • Alarcón, Luis F.
  • Pellicer, Eugenio|||0000-0001-9100-0644
[EN] There is a beneficial effect when integrating Building Information Modeling (BIM) with lean practices to identify and reduce waste in the construction industry. According to experts, it is possible to improve the design process through waste reduction by implementing lean practices and BIM. An unexplored perspective on these synergies concerns the relationship between the specific uses of BIM and lean practices. Therefore, this study analyzed the relationships between Lean Design Management (LDM) practices and BIM uses in the planning and design phases of the infrastructure lifecycle. To achieve this objective, the research was organized into three stages: (1) the explanation of LDM practices and BIM uses; (2) the characterization of sample projects and data collection strategies; and (3) data exploration, including reliability analysis, descriptive statistics, association analysis, and a causal analysis of LDM practices and BIM uses. The analysis of the relationship between LDM practices and BIM uses generated empirical evidence of the implementation of BIM uses and lean management practices at the design phase. LDM practices from the categories planning and control and problem-solving and decision-making were more related to BIM uses than LDM practices from the category stakeholder management. Additionally, it was concluded that if a project applies a higher proportion of BIM uses, it will tend to apply a higher proportion of LDM practices; however, this relationship is not as clear in the other way around., The authors acknowledge the help and support provided by GEPUC, which provided access to data collection for this study. In addition, the authors acknowledge financial support from FONDECYT (1181648) and the Pontificia Universidad Católica de Chile. Rodrigo Herrera acknowledges financial support for Ph.D. studies from Vicerrectoría de Investigación (VRI) of Pontificia Universidad Católica de Chile (PUC) and CONICYT-PCHA/National Doctorate/2018 -21180884.
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects

  • Rojas, María José
  • Herrera, Rodrigo F.
  • Mourgues, Claudio
  • Ponz-Tienda, José Luis
  • Alarcón, Luis F.
  • Pellicer, Eugenio|||0000-0001-9100-0644
[EN] The evaluation of BIM capabilities and repeatability enables a company or project to identify its current status and how to improve continuously; this evaluation can be performed with BIM maturity models. However, these maturity models can measure the BIM state but not specifically the application of BIM uses. Likewise, in interorganizational project teams with a diversity of factors from various companies, it is possible to evaluate the capacity at a specified time with specified factors, but it is not possible to evaluate the repeatability unless the client always works with the same project teams. Therefore, despite the existence of various BIM uses in the literature, there is no instrument to evaluate the level of implementation of them in construction projects. This research proposes a BIM Use Assessment (BUA) tool for characterizing the levels of application of the BIM uses in the planning and design phases of building projects. The research methodology was organized into three stages: (1) identification, selection, and definition of BIM uses; (2) proposal of the BUA tool for characterizing the level of BIM use application; and (3) validation of the BUA tool. The tool was validated using 25 construction projects, where high reliability and concordance were observed; hence, the BUA tool complies with the consistency and concordance analysis for assessing uses in the design and planning phases of construction projects. The assessment will enable self-diagnosis, stakeholder qualification/selection, and industry benchmarking., This work was supported by FONDECYT (1181648 to Alarcón L. F. and Mourgues C.) and CONICYT, Chile (PCHA/National Doctorate/2018-21180884 to Herrera R. F.).
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
Publication Artículo científico (JournalArticle)

Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis

  • Herrera, Rodrigo F.
  • Mourgues, Claudio
  • Alarcón, Luis F.
  • Pellicer, Eugenio|||0000-0001-9100-0644
[EN] Social network analysis (SNA) has not been used to study design project teams in which the full interactions have become more complex (formal and informal) because the team members are from different companies and there is no colocation. This work proposes a method to understand the interactions in the design teams of construction projects using SNA metrics and the sociograms generated within temporary organizations. This study includes three stages: (1) a literature review of the dimensions of interactions within work teams and the application of SNA to the architecture, engineering, and construction (AEC) industry; (2) a proposal of an interaction network method for construction project design teams; and (3) an analysis of a pilot project. Interaction networks were defined in two categories: general interactions and commitment management. For each network, metric indicators were defined for the analysis. The pilot project showed high levels of consistency among team responses. The proposed method allows an analysis of the entire work team and of each individual team member. The method also makes it possible to analyze the work team from a global perspective by carrying out a joint analysis of two or more networks., The authors would like to acknowledge the help and support provided by GEPUC and GEPRO SpA., which provided access to data collection for this study. In addition, the authors acknowledge financial support from FONDECYT (1181648) and the Pontificia Universidad Catolica de Chile. Rodrigo Herrera acknowledges financial support for Ph.D. studies from VRI of PUC and CONICYT-PCHA/National Doctorate/2018-21180884.