MODELOS DE TRANSPORTE REACTIVO EN MEDIOS POROSOS CON ACTUALIZACION DINAMICA DE LOS PARAMETROS EN INTERFACES REACTIVAS

CGL2016-78281-R

•
Funding agency name Agencia Estatal de Investigación
Funding agency acronym AEI
Program Programa Estatal de I+D+i Orientado a los Retos de la Sociedad
Call Proyectos I+D+i Retos de Investigación
Call year 2016
State Plan 2013-2016 Plan Estatal de Investigación Científica y Técnica y de Innovación
Beneficiary centre UNIVERSIDADE DA CORUÑA

Resultados relacionados

Resultados totales (Incluyendo duplicados): 6
Encontrada(s) 1 página(s)

RUC. Repositorio da Universidade da Coruña
Publication Artículo científico (JournalArticle)

A revisited thermal, hydrodynamic, chemical and mechanical model of compacted bentonite for the entire duration of the FEBEX in situ test

  • Samper, Javier
  • Mon, Alba
  • Montenegro, Luis
Versión aceptada de https://doi.org/10.1016/j.clay.2018.02.019, [Abstract:] The safety assessment of geological repositories for radioactive waste requires quantifying the geochemical evolution of the engineered clay barriers where thermal (T), hydrodynamic (H), mechanical (M) and chemical (C) phenomena play a major role during the early stages of the repository. Compacted bentonite is one of the components of the engineered barrier system. The FEBEX (Full-scale Engineered Barrier EXperiment) in situ heating and hydration test was performed at the Grimsel underground laboratory (Switzerland) in two operation periods. The 1st period lasted from 1997 to 2002 when heater 1 was switched off and the area around it was dismantled. Heater 2 was turned off and the full test was dismantled in 2015. Here we present a revisited THCM model of the two operation periods of the FEBEX in situ test, which improves the THCM model reported by Zheng et al. (2011) for the 1st operation period by revising the boundary condition at the heater/bentonite interface, refining the spatial discretization of the finite element mesh near the heater, updating the dispersivities of the bentonite and the granite and revisiting the back-diffusion of solutes from the bentonite barrier into the granite. The concentrations of dissolved Cl− computed with the revisited model at the end of the 1st operation period almost coincide with those of the previous model, except near the heater where the concentrations computed with the revisited model are much larger than those of the previous model. Both models provide a similar fit to the pore water concentration data inferred from aqueous extracts because the model differences occur in a band 0.045 m thick near the heater where there are no measured pore water chemical data. Solute back-diffusion from the bentonite pore water to the granite groundwater is not uniform along the FEBEX gallery due to the heterogeneity of the surrounding granitic formation. The revisited model reproduces the trends of the experimental observations of solute back-diffusion by adopting diffusion coefficients of the bentonite and granite larger than those of the simulation run without the solute back-diffusion. The results of the revisited THCM model match the gravimetric water content and dry density data measured at the end of both operation periods in 2002 and 2015 and fit the general trends of the on line data of temperature and volumetric water content in the bentonite and pore water pressure in the granitic rock collected from 2002 to 2015. The predicted concentrations of the dissolved species in 2002 are sensitive to changes in the vapour tortuosity factor and the retention curve of the bentonite, but are less sensitive to smectite dissolution. The predicted concentrations of the dissolved species at the end of the 2nd operation period in 2015 computed with the revisited THCM model are large near the heater and decrease towards the bentonite/granite interface. The concentrations are generally smaller than those computed at the end of the 1st operation period, except for the concentration of dissolved HCO3– which increases due to a calcite dissolution front. The predicted pH at the end of the 2nd operation period is similar to that of the 1st operation period. The concentrations of dissolved Cl− predicted at the end of the 2nd period with the revisited model reproduce the sharp increase of the measured Cl− data near the heater and match the data measured in 5 out of 6 radial distances., The FEBEX-DP Consortium funded the dismantling operation in 2015. The support of the responsible person of the Consortium, Dr. Florian Kober, is greatly acknowledged. Additional funding by the Spanish Ministry of Economy and Competitiveness (Project CGL2016-78281-R), the FEDER funds (Project CGL2016-78281-R) and the Galician Regional Government (Ref. ED431C 2017/67 from “Consolidación e Estruturación de Unidades de Investigación Competitivas”, Grupos de Referencia Competitiva) are acknowledged. Alba Mon enjoyed a research contract from University of A Coruña. We thank the comments, corrections and suggestions of the two reviewers which contributed to the significant improvement of the paper., Xunta de Galicia; ED431C 2017/67
RUC. Repositorio da Universidade da Coruña
Publication Artículo científico (JournalArticle)

Long-term non-isothermal reactive transport model of compacted bentonite, concrete and corrosion products in a HLW repository in clay

  • Mon, Alba
  • Samper, Javier
  • Montenegro, Luis
  • Naves, Acacia
  • Fernández Ruiz, Jesús
Versión aceptada de https://doi.org/10.1016/j.jconhyd.2016.12.006, [Abstract:] Radioactive waste disposal in deep geological repositories envisages engineered barriers such as carbon-steel canisters, compacted bentonite and concrete liners. The stability and performance of the bentonite barrier could be affected by the corrosion products at the canister-bentonite interface and the hyper-alkaline conditions caused by the degradation of concrete at the bentonite-concrete interface. Additionally, the host clay formation could also be affected by the hyper-alkaline plume at the concrete-clay interface. Here we present a non-isothermal multicomponent reactive transport model of the long-term (1 Ma) interactions of the compacted bentonite with the corrosion products of a carbon-steel canister and the concrete liner of the engineered barrier of a high-level radioactive waste repository in clay. Model results show that magnetite is the main corrosion product. Its precipitation reduces significantly the porosity of the bentonite near the canister. The degradation of the concrete liner leads to the precipitation of secondary minerals and the reduction of the porosity of the bentonite and the clay formation at their interfaces with the concrete liner. The reduction of the porosity becomes especially relevant at t = 104 years. The zones affected by pore clogging at the canister-bentonite and concrete-clay interfaces at 1 Ma are approximately equal to 1 and 3.3 cm thick, respectively. The hyper-alkaline front (pH > 8.5) spreads 2.5 cm into the clay formation after 1 Ma. Our simulation results share the key features of the models reported by others for engineered barrier systems at similar chemical conditions, including: 1) Pore clogging at the canister-bentonite and concrete-clay interfaces; 2) Narrow alteration zones; and 3) Limited smectite dissolution after 1 Ma., The research leading to this work has received funding from the PEBS Project of the European Atomic Energy Community's Seventh Framework Programme (FP7/2007-2011) under grant agreement #232598 and the CEBAMA Project of the European Atomic Energy Community's (Euratom) Horizon 2020 Programme (NFRP-2014/2015) under grant agreement # 662147. This work was partly funded by ENRESA (Spain), the Spanish Ministry of Economy and Competitiveness (Projects CGL2012-36560 and CGL2016-78281) with support from the FEDER funds and the Galician Regional Government (Project 10MDS118028PR and Fund 2012/181 from “Consolidación e estruturación de unidades de investigación competitivas”, Grupos de referencia competitiva). The first author enjoyed a research contract from University of A Coruña and the fifth author had a Contract from the FPI Program of the Spanish Ministry of Economy and Competitiveness., Xunta de Galicia; 10MDS118028PR, Xunta de Galicia; 2012/181
RUC. Repositorio da Universidade da Coruña
Publication Artículo científico (JournalArticle)

THCM numerical simulations of the engineered barrier system for radioactive waste disposal

  • Samper, Javier
  • Mon, Alba
  • Montenegro, Luis
  • Naves, Acacia
Versión aceptada de: https://doi.org/10.1680/jenge.19.00104, [Abstract:] The final disposal of high-level radioactive waste in geological repositories envisages an engineered barrier system with a bentonite buffer, which will be subjected to strongly coupled thermal, hydrodynamic, geochemical and mechanical (THCM) processes. This paper presents coupled THCM numerical simulations of laboratory and in situ tests performed with compacted Full-scale Engineered Barrier Experiment (Febex) bentonite having different space and time scales. The simulations of the heating and hydration tests fit the measured temperature, water content and water intake data and reproduce the trends of the geochemical data. Although simulation results of the tests display similar trends, they show differences due to geometry and initial and confining conditions. The changes in porosity due to mineral dissolution/precipitation are not relevant in these tests but become relevant in long-term simulations, which show that the precipitation of corrosion products reduces significantly the porosity of the bentonite near the canister and causes pore clogging. The thickness of the bentonite alteration band is simulated to be smaller than 7 cm after 1 Ma., The research leading to these results received funding from the PEBS Project of the European Atomic Energy Community’s Seventh Framework Programme (FP7/2007-2011) under grant agreement 232598. This work was partly funded by ENRESA (Spain), the Spanish Ministry of Economy and Competitiveness and FEDER Funds (Project CGL2016 78281) and Galicia Regional Government (Fund ED431C 2017/67 from “Consolidación e estruturación de unidades de investigación competitivas”, Grupos de referencia competitiva). Alba Mon enjoyed a research contract from University of A Coruña. We thank the comments and corrections of the two anonymous reviewers because they contributed to improve the manuscript., Xunta de Galicia; ED431C 2017/67
RUC. Repositorio da Universidade da Coruña
Publication Artículo científico (JournalArticle)

Demonstrative actions of spring restoration and groundwater protection in rural areas of Abegondo (Galicia, Spain)

  • Naves, Acacia
  • Samper, Javier
  • Mon, Alba
  • Pisani, Bruno
  • Montenegro, Luis
  • Carvalho, J. Martins
Versión aceptada de: https://doi.org/10.1007/s40899-017-0169-5, [Abstract:] There is an increasing concern about the chemical and microbiological quality of spring waters in Galicia (Spain) due to bacteriological and nitrate contamination. Demonstrative actions of spring restoration and groundwater protection were implemented in five selected springs and fountains in the municipality of Abegondo. These actions include the cleaning and disinfection of the fountains, the restoration of the spring catchments and the definition and the implementation of the spring protection zones. Available topographic, geological, meteorological, hydrological, hydrogeological and hydrochemical data of the area were used to: (1) elaborate the hydrogeological conceptual model of the study area; (2) assess the groundwater chemical and microbial status; and (3) define the spring protection zones with a numerical groundwater flow and solute transport model solved with the CORE2D code. Spring protection zones include: (1) an immediate zone of absolute restrictions around the spring with a radius of 3 m; (2) an intermediate zone of maximum restrictions where potential contamination activities are restricted; this zone has a radius of 30 m and is defined on the basis of a 50 days transit time; and (3) a remote zone which includes the rest of the contributing groundwater basin where restrictions are moderate. The protection zones defined in the project were included in the general development plan of the municipality. The chemical and microbial data of the springs were monitored during 3 years after the restoration actions. The cleaning and disinfection of the fountains and spring catchments were efficient in dropping noticeably the microbiological contamination and reducing mildly the nitrate concentrations (from 10 to 20%). The efficiency of the restoration measures was partially reduced by: (1) the low frequency of the cleaning and disinfection of the fountains; and (2) the lack of actions to enforce the restrictions in the protection zones to prevent the excessive use of manure as fertilizer in the surroundings of some springs., This work was carried out within the framework of the AQUA PLANN Project of the LIFE+ Programme (07/ENV/E/000826) funded by the European Commission. We acknowledge the support provided by Carlos Ameijenda from the Secretariat of the Project in the Municipality of Abegondo and Roberto Arias from Aguas de Galicia (Xunta de Galicia). This work was also partly funded by the Spanish Ministry of Economy and Competitiveness (Project CGL2016-78281), FEDER funds and the Galician Regional Government, Xunta de Galicia (Fund 2012/181 from “Consolidación e estruturación de unidades de investigación competitivas”, Grupos de referencia competitiva). We thank the comments, corrections and suggestions of the two anonymous reviewers of the manuscript which contributed to improving it., Xunta de Galicia; 2012/181
RUC. Repositorio da Universidade da Coruña
Publication Artículo científico (JournalArticle)

Coupled THCM model of a heating and hydration concrete-bentonite column test

  • Samper, Javier
  • Mon, Alba
  • Montenegro, Luis
  • Cuevas, Jaime
  • Turrero, María J.
  • Naves, Acacia
  • Fernández, Raúl
  • Torres, Elena
Versión aceptada de https://doi.org/10.1016/j.apgeochem.2018.05.007, [Abstract] Radioactive waste disposal in deep geological repositories in clay formations envisage a compacted bentonite engineered barrier and a concrete liner. The alkaline conditions caused by the degradation of concrete could affect the performance of the engineered barrier. The geochemical interactions occurring at the concrete-bentonite interface (B-CI) for the non-isothermal unsaturated conditions prevailing at repository post-closure have been studied by CIEMAT with a heating and hydration concrete-bentonite column test. The column consists of a 3 cm thick concrete sample emplaced on top of a 7.15 cm block of compacted bentonite. The column was hydrated through the concrete at a constant pressure with a synthetic clay porewater while the bottom of the column was heated at 100 °C. Here we report a coupled thermo-hydro-chemical-mechanical (THCM) model of the column test, which lasted 1610 days. The model was solved with a THCM code, INVERSE-FADES-CORE. Experimental observations show calcite and brucite precipitation in the concrete near the hydration boundary, portlandite dissolution and calcite and ettringite precipitation in the concrete, calcite and sepiolite precipitation in the bentonite near the B-CI, calcite dissolution in the bentonite far from the B-CI and gypsum precipitation in the bentonite near the heater. Model results attest that advection is relevant during the first months of the test. Later, solute diffusion becomes the dominant transport mechanism. Calcite and brucite precipitate in the concrete near the hydration boundary because the concentrations of dissolved bicarbonate and magnesium in the hydration water are larger than the initial concentrations in the concrete porewater. Calcite and brucite precipitate in both sides of the B-CI. Sepiolite precipitates in the bentonite near the B-CI. The model predicts portlandite and C1.8SH dissolution in the concrete. Ettringite and C0.8SH precipitate near the hydration boundary while ettringite dissolves in the rest of the concrete at very small rates. The porosity changes occur at the hydration boundary and at both sides of the B-CI due to mineral dissolution/precipitation. The porosity reduces to zero in a 0.03 cm thick zone in the concrete near the B-CI due to brucite and calcite precipitation. The high pH front (pH > 8.5) diffuses from the concrete into the bentonite and penetrates 1 cm at the end of the test after 1610 days. Model results are sensitive to grid size. Mineral precipitation and the thickness of the zone affected by mineral precipitation in the bentonite near the B-CI increase when the grid size increases while pore clogging in the concrete near the B-CI is computed only for grid sizes smaller than 0.018 cm. The non-isothermal conditions play an important role in mineral precipitation. The reduction in porosity in the B-CI for constant temperature is smaller than that of the non-isothermal run. The model reproduces the on-line measured temperature and relative humidity data as well as the water content and porosity data collected at the end of the test. Model results capture the main trends of the mineralogical observations, except for ettringite and CSH phases for which the predicted precipitation is smaller than the observed values. Model results improve when the specific surface of ettringite is increased by a factor of 10., The research leading to these results has received funding from the European Union's European Atomic Energy Community's (Euratom) Horizon 2020 Programme (NFRP-2014/2015) under grant agreement, 662147 – CEBAMA. This work was partly funded by the Spanish Ministry of Economy and Competitiveness (Grant number CGL2016-78281) with support from the FEDER funds and the Galician Regional Government (Grant number ED431C 2017/67 from “Consolidación e estruturación de unidades de investigación competitivas”, Grupos de referencia competitiva). The second author enjoyed a research contract from University of A Coruña. We thank the comments, corrections and suggestions of the Guest Editor and the two anonymous reviewers who contributed to the improvement of the paper., Xunta de Galicia; ED431C 2017/67
RUC. Repositorio da Universidade da Coruña
Publication Artículo científico (JournalArticle)

Dynamic update of flow and transport parameters in reactive transport simulations of radioactive waste repositories

  • Fernández Águila, Jesús
  • Samper, Javier
  • Mon, Alba
  • Montenegro, Luis
Versión aceptada de https://doi.org/10.1016/j.apgeochem.2020.104585, [Abstract:] The changes in porosity caused by mineral dissolution/precipitation and the associated changes in flow, transport and chemical parameters of porous and fractured media are relevant for the geochemical time-evolution of natural and engineered underground systems. The realistic representation of natural systems requires modeling tools accounting for the changes in porosity. Here, we investigate the significance of the dynamic upgrade of the flow, transport and chemical parameters in reactive transport models with mineral dissolution/precipitation. The water flow, heat transfer and multicomponent reactive solute transport code, CORE2DV5, was extended to take into account the changes in porosity provoked by mineral dissolution/precipitation and their effect on flow, solute transport and chemical parameters. The improvements implemented in the code were verified against analytical solutions and the numerical solutions computed with other reactive transport codes with similar capabilities for isothermal mineral dissolution/precipitation test cases. Model results computed with CORE2DV5 agree with the analytical and numerical solutions for several isothermal test cases with porosity feedback. Model results show that failing to account for the porosity feedback leads to large errors. The porosity feedback effect (PFE) is especially relevant in long-term problems with mineral dissolution/precipitation leading to strong changes in porosity. The PFE is analysed with a non-isothermal geochemically-reactive transport model of the long-term (4·104 years) interactions of compacted bentonite with corrosion products and concrete in a high-level radioactive waste repository in clay. The model predicts pore clogging in the concrete and at the concrete-clay interface. The thickness of the zone affected by pore clogging computed with the PFE is smaller than that computed without the PFE., This work was funded by the CEBAMA Project of the European Atomic Energy Community's (Euratom) Horizon 2020 Programme (NFRP-2014/2015) under grant agreement # 662147, the Spanish Ministry of Economy and Competitiveness (Project CGL2016-78281), the FEDER funds, ENRESA (Spain), and the Xunta de Galicia (Galician Regional Government, project ED431C 2017/67). The first author enjoyed a Contract from the FPI Program of the Spanish Ministry of Economy and Competitiveness. We thank the comments and corrections of the three anonymous reviewers who contributed to the improvement of the paper., Xunta de Galicia; ED431C 2017/67